小小的船教学案例1内容摘要:
球交替兴奋,为充分挖掘大脑潜力创造了条件。 因而,我创设了如下情境:出示蓝天图,让学生边唱 “一闪一闪亮晶晶 ”,边贴星星。 看这晴朗的夜晚,闪烁的星星在蓝天一闪一闪,多美啊。 还缺了什么 ?(通过说话,弄清星星与月亮的关系) (贴上月亮)弯弯的月亮像什么 ?你觉得这弯弯的月儿还像什么(想象练说)这么美的月空, 教师 要用一首歌来赞美它。 (弹唱歌曲《小小的船》) 画美,歌更美。 这首歌的歌词就是我们今天要学的课文,等学完了课文,我们也来唱一唱,好吗 ?(出示课题) 通过有目的地引导学生唱一唱,动手贴一贴, 说一说,充分调动了他们的想象力,激发了他们参与学习的热。小小的船教学案例1
相关推荐
to at a to n to to in to of to be or to of of of To A is a by or A to a of in as an by of to of in of O) of be to or to at vs or of is at or be on a or as as or to of to HR to at or ad by Os to or L
To a of s To To To to of of of to L P by to U up of on on a to U in at of to in in to on a on on or be s do is On L P to of of to to to to to L of be eg by on or of o 0 0 ,200 1,400 350 10 0 7 31 151
To be of To of To to To of of ? of to ( of to of of to of of of in of of is L (no to of is by on or of of to of to of of L to ad of of to of to of s) of to as On of of to of to of On or IS is of on
To a of s To To To to of of of to L P by to U up of on on a to U in at of to in in to on a on on or be s do is On L P to of of to to to to to L of be eg by on or of o 0 0 ,200 1,400 350 10 0 7 31 151
嘎子连忙抓起身边的一把扫帚,使出浑身力气朝鬼子官身上拍去 ,可是不顶用,鬼子官已经把手枪掏出来了。 嘎子一急,扑上去,用身子使劲压住了他的胳膊,又狠狠咬住他的手腕,把手枪夺了下来。 找出嘎子夺枪时的动作,用“▲”注释出来。 战士们从屋里冲了出来。 随着啪的一声枪响,鬼子官被击中了。 他身子一拱,滚到了嘎子脚下。 嘎子连忙 抓 起身边的一把扫帚( s224。 ozhou),使出浑身力气朝鬼子官身上