u3t1b教学设计内容摘要:

words in this section: live, say, lot, a lot, about. work, pair work and the whole class work. the letter. 1).Listen to 1a and plete the table in 1b. Check the answers with your partner. Then the whole class check the answers. 2).Listen again and answer the following questions. Girls ask and boys answer. 1). Play the tape. 2).Give incentive languages. Consolidation (5 minutes) work and pair work worl and pair worl 1. Complete the passage based on 1b individually. the passage loudy. the answers. Make sure the students use the form of the verbs correctly. Practice (5 minutes) whole class work 1. Talk about pen pals. ( 1) Do you have a pen friend/penpal? ( 2) Does he/she like China? ( 3) Does he/she speak 1. Ask and Lead. 2. Individal work. Chinese? ( 4。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。