unit1womenofachievement第一课时教学设计(1)内容摘要:

en. Her work encouraged many other women to bee Lin Qiaozhi (19011983), China D. She was an inventor and a scientist from Poland. She went to Paris and studied physics and chemistry there. She is the only woman scientist who was awarded two Nobel Prizes. On July 4,1934, she died in Paris, killed by her own experiments. She died of radiation poisoning(放射物中毒 ). Marie Curie (18671934) E. A girl from the countryside who dressed as a man and went to fight for the French and to drive the English out of France. She was caught and put to death by the Joan of Arc(14121432), France 3. 学生讨论并概括有成就的女性的优秀品质。 学生概括好 后,教师引导学生小结描述有成就的女性的一些形容词。 【设计说明】使学生通过 猜谜游戏 、 介绍了历史上和现今的伟大女性 ,讨论概括出“有成就的女性所有的优秀品 质”,提高学生对女性的社会角色的正确认识,培养学生勇于战胜学习和生活中的困难 的自信心。 Step2 Prereading 课件展示幻灯片 3,再次让学生学习 Jane Goodall 的简介文本信息,通过教师设问 过渡到观看第 2 个视频,使学生从视频资源中获取 有关 Jane Goodall 的研究活动和有关黑猩猩的信息,进入课文预读。 在播放视频前 教师设问: you know anything about the life of chimps? Will you go to the forests Do to study it instead of going to university? 【设计说明】使学生通过再次学习 Jane Goodall 的简介和观看她在非洲森林里研究黑 猩猩的视频的活动,培养学生从文本资源和视听资源获取有关信息的能力,并为进入课 文阅读输入相关的背景知识。 Step3 Reading for information 1. 1streadi。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。