module3复习课件龙泉实验学校修伟娜内容摘要:

Eye ? ④ Did Lingling like the postcard? is Amy doing? many people are there in the dialogue? There are three people in the dialogue. She is calling with Daming. did they go? They went to the British Museum. And they visited Big Ben and the London Eye. did they do at the weekend? They visited lots of places. ’s the London Eye? Lingling like the bus ride? It’s a big wheel. It’s wonderful. Yes, she did. ( /Lingling) phoned ( /Sam). At the。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。