20元的故事(中英文)内容摘要:
angrier about the little boy’s questions. 他怎么敢只为了钱而问这种问题 ? How dare he ask such questions only to get some money? 约一小时后 , 他平静下来了 , 开始想着他可能对孩子太凶了 After about an hour or so, the had calmed down, and started to think hey may have been a little hard on his son. 或许他应该用那 10块钱美金买小孩真正想要的 , 他不常常要钱用 Maybe there was something he really needed to buy with that $10 and he really didn39。 t ask for money very often. 父亲走到小孩的房门并打开门 The man went to the door of the little boy’s room and opened the door. 「 你睡了吗孩子 ?」 他问着 “ are you asleep, son?” he asked. 「 爸 , 还没睡 , 我还醒着 」 小孩回答着 “ no daddy, I’m awake” replied the boy. 「 我想过了 , 我刚刚可能对你太凶了 」 父亲说着 “ I’ve been thinking, maybe I was too har。20元的故事(中英文)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。