【单元测试三】内容摘要:
pen, it’s black. And this is an eraser, it’s blue and white. They’re in the pencil box. This is a ruler, it’s red, it’s on the pencil box. That is a ruler, too. It’s yellow. It’s in the drawer. Where’s the English book? Ah, it’s there, under the sofa. 1. This is ______ pencil box. A. your B. her C. his D. my 2. The yellow ruler is _______. A. in the bag B. in the drawer C. on the pencil box D. in the pencil box in the。【单元测试三】
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。