【单元测试】unit4内容摘要:
ld, and he likes watching TV very much. But his parents ___1___ let him. They would say, “You ___2___study now and you should go to bed early, you can watch TV ___3___in the summer holiday.” 2 It was summer. Bob watched TV ___4___. It was very difficult ___5___ his mother to get him to take a shower. “You said I could watch TV in the summer holiday.” Bob said to his mother, “And there ___6___another show to watch.” ___7___ one Saturday evening, his mother said to him,” It’s hot, Bob ___8___needs a shower. Tell me what’s ___9___for you to take a shower.” “Well, wait a minute,” said Bob. He picked up the TV program to read. About ___10___, he came to his mother and said, “Mum, I think 8:30 Tuesday morning would be.” 1. A. aren’t B. don’t C. doesn’t D. won’t 2. A. can B. may C. have to D. need 3. A. only B. inside C. outside D. nearly 4. A. long all day B. day all long C. all day long D. all long day 5. A. with B. to C. for D. of 6. A. is going to be B. is going to have C. will have D. are going to be 7. A. On B. In C. At D. / 8. A. Someone B. Everyone C. Anyone D. Nobody 9. A. a best time。【单元测试】unit4
相关推荐
it in their tea. They put sugar in their tea, as well. They are the world’ s biggest tea drinkers. They like Chinese tea, but they drink mostly strong black tea from India and Sri Lanka(斯里兰卡) . They
r was just the one sentence, “It’s so cool.”Maybe he thought it was the best way to show what he saw and felt. But the story also shows a scarcity(缺乏) of “cool”,some people have no words to show the
码是多少。 What’s ______ ______ ______? 5. 她的茶杯是紫色的。 Her ______ is ______? 六、句型转换。 1. His name is Li Yugang. (改为同义句 ) ______ ______ Li Yugagn. 2. The desk is white. (就划线部分提问 ) _____ ______ is the desk? 3.
1、光世昌老师高中物理精品资源免费下载地址 (选择题)和第 卷(非选择题)两部分。 试卷满分 300 分。 考试时间150 分钟。 考生注意:1答题前,考生务必将自己的准考证号、姓名填写在答题卡上。 考生要认真核对答题卡上粘贴的条形码中“准考证号、姓名、考试科目”与考生本人准考证号、姓名是否一致。 2第 I 卷每小题选出答案后,用 2B 铅笔把答题卡上对应题目的答案标号涂黑。 如需改动
中,往其中一只中加入 2mL的水,振荡,静置。 往另一支试管中加入2mL 酒精,振荡,静置。 [板书]无色液体,沸点比乙烷的高,难溶于水,易溶于有机溶剂,密度比水大。 [问] 你能否根据所学知识推测: 氯乙烷的沸点比溴乙烷的沸点是高还是低。 为什么。 [讲] 低,有可能是常温下是气体,因为氯乙烷与溴乙烷的结构相似,而相对分子质量小于溴乙烷,分子间作用力小,故沸点低。 [小结]
1、光世昌老师高中物理精品资源免费下载地址 (理科综合)本试卷分第 I 卷(选择题)和第 (非选择题)两部分。 满分 300 分,考试时间 150 分钟。 第卷 (选择题 共 126 分)一、选择题(本题共 13 小题,每小题 6 分,共 78 分。 在每小题给出的 4 个选项中,只有一项是符合题目要求的。 )1下列有关细胞结构和功能的叙述,错误的是 (