东莞康特尔电子公司trialrun试验运行报告书(编辑修改稿)内容摘要:
Prepared by : CRE054A Page 5 东莞 康特尔 电子有限公司 First Article Inspection Check Report Trial Run No: DEM060301 Model BOM No. Work Order Trial Run Date Total QTY TRun Times Trial Run Dept. PDV300A CTEB3003 90 1 DE SMT Check Time DIP(Continue) Check Time Packing Type Location Part No. BOM Working Sample Packing Type Location Part No. BOM Working Sample QFP U10 Connector QFN SOP Crystal Other Other DIP Check Time Assembly Check Time Packing Type Location Part No. BOM Working Sample Confirm Item Confirm Result CAP 1 Framework Test Check Time Confirm Item Confirm Result 1 Firmware Update 2 Default Value 3 Function Test 4 Approved by : Checked by : Prepared by : CRE054A Page 6 东莞 康特尔 电子有限公司 Trial Run SMT Report Trial Run No: DEM060301 Model Reversion BOM No. Work Order. Total QTY TRun Times Trial Run Dept. PDV300A CTEB3003 90 1 SMT Total Input QTY Defect QTY Yield Rate Trial Run Date: 自 年 月 日 ~ 年 月 日完成 1. Trial Run Status: 2. Defect Analysis: Item Defect Symptom QTY Root cause C/A Owner 1 2 3 4 5 6 7 8 9 10 11 12 13 Remark 3. Transfer Status: 良品 不良品 暂置 Approved by : Checked by : Prepared by : CRE054A Page 7 东莞 康特尔 电子有限公司 Trial Run DIP Report Trial Run No: DEM060301 Model Reversion BOM No. Work Order Total QTY TRun Times Trial Run Dept. PDV300A CTEB3003 90 1 DIP Total Input QTY Defect QTY Yield Rate Trial Run Date: 自 年 月 日 ~ 年 月 日完成 1. Trial Run Status: 2. Defect Analysis: Item Defect Symptom QTY Root cause C/A Owner 1 2 3 4 5 6 7 8 9 10 Remark 3. Transfer Status: 良品 不良品 暂置 Approved by : Checked by : Prepared by : CRE054A Page 8 东莞 康特尔 电子有限公司 Trial Run Assembly Report Pilot Run No: DEM060301。东莞康特尔电子公司trialrun试验运行报告书(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。