七下unit7内容摘要:
er here is cool and cloudy, just right for walking. See you next month. Dave To Jane ______ ______ ______ To Jane ______ ______ ______ 2c. Fill in the chart with information from the postcards in 2b. Name Where are they? How’s the weather? What are they doing? Su Lin Dave in Canada in Europe warm and sunny cool and cloudy 1. visiting her aunt in the mountains 2. studying English 3. visiting old friends 4. sitting by the pool 2. writing to Jane 3. What else is she doing there? _________________________________ 4. What’s she doing right now? _________________________________ 5. How’s the weather there? _________________________________ 6. What does she think of seeing her friends again? _________________________________ Read the first postcard and answer the questions. 1. Where is Su Lin now? _________________________________ 2. What is Su Lin studying there? _________________________________ She’s in Canada now.。七下unit7
相关推荐
1、光世昌老师高中物理精品资源免费下载地址 卷(选择题)和第 (非选择题)两部分。 满分 300 分,考试时间 150 分钟。 相对原子质量:H 1 C 12 K 39 0 6第 I 卷(选择题 共 120 分)一、选择题(本题共 17 小题。 在每个小题给出的四个选项中只有一个选项符合题目要求。 )1目前我国许多地方有计划地接种“甲流感疫苗” ,接种该疫苗后在体内可引起的免疫反应是 AB 细胞
1、光世昌老师高中物理精品资源免费下载地址 启用前 试卷类型:2小题,满分150分考试时间120分钟本试卷共15页,32小题,满分300分考试时间150分钟注意事项:1答卷前,考生务必用黑色字迹的钢笔或签字笔将自己的姓名和考生号、试室号、座位号填写在答题卡上用2A)填涂在答题卡相应位置上2选择题每小题选出答案后,用2需改动,用橡皮擦干净后,再选涂其他答案
1、光世昌老师高中物理精品资源免费下载地址 (选择题)和第 (非选择题)两部分,全卷满分 300 分,考试用时150 分钟。 注意事项:1答题前,考生务必将自己的准考证号、姓名填写在答题卡上。 考生要认真核对答题卡上所粘贴的条形码中“准考证号、姓名、考试科目”与考生本人准考证号、姓名是否致。 2答第 I 卷时,每小题选出答案后,用 2B 铅笔把答题卡上对应题目的答案标号涂黑。 如需改动
Betty Daming will study at home in the future. will send their homework to the teacher by . will be a puter on every desk in the future. will use paper, pens and pencils. √ √ √ √ the best answer to
快乐。 ⑩ ⑧ 一个 “ 啊 ” 字,写出了 “ 我 ”的惊讶。 ⑨对 “ 我 ” 的心理描写,表现了惭愧的心理。 ⑩这一段第一句话和开头相照应,第二句话是议论,深化主题。 【 总评 】 这篇作文回忆了一年前在公交车上发生的一件事,通过受伤小伙子让座的感人故事,歌颂了社会新风貌。 文章记叙详细,注重了细节描写,对人物的观察细致,特别是对那个让座小伙子的描写,生动形象,非常感人。