仁爱七上英语期中试卷20内容摘要:
er D. his ( )4. A. look at B. look C. give D. see ( )5. A. the B. an C. / D. a ( )6. A. a red B. in red C. red D. in a red ( )7. A. four B. three C. two D. one ( )8. A. is B. be C. am D. are ( )9. A. to B. and C. too D. but ( )10. A. have B. has C. are D. is Ⅲ .阅读理解。 ( 40 分) ( A) This is Lucy and this is Lily. They are sisters. They are eleven. This is their bedroom(卧室 ). It’s big. The green bed(床 ) is Lily’s and the blue one is Lucy’s. They have two desks. Lucy’s is yellow, but Lily’s is red. Look! Here is a photo. The girl in purple is Lucy and the one in white is Lily. Their schoolbags are on the bed. Lucy’s is small, but Lily’s is big. They have the same color. 根据短文内容,判断正 (T)误 (F)。 ( )1. Lucy and Lily aren’t sisters. ( )2. Lily’s bed is green. ( )3. Their desks have the same color. ( )4. Lucy is in white and Lily is in purple. ( )5. Lucy has a small schoolbag. (B) Hello! My name is Joy. I’m a girl. I’m eleven. I’m in Class Eight, Grade Seven. This is my friend, Joan. She is twelve. She is in a high school. She is in Class Seven, Grade Eight. My English teacher is Miss White, but her English teacher is Miss Green. Look。 Who’s that? Oh, she’s my mom. She’s a Chinese teacher. 根据短文内容,选择正确答案。 ( )6. ____ is in Class Eight, Grade Seven. A. Joan B. John C. Joy D. Joe ( )7. Joan is Joy’s ____. A. teacher B. friend C. student D. mom ( )8. Joan is ____. A. eleven B. twelve C. thirteen D. fourteen ( )9. Joy’s English teacher is ____. A. Miss White B. Miss Green C. Joy’s mom D. Joan ( )10. Joy’s mother is ____. A. an English teacher B. a friend C. a student D. a Chinese teacher (C) My name is Bill. I’m an English boy. I’m in a high school. Sam is my good friend. He es from Canada. He is thirteen. I’m thirteen, too. But we don’t look the same. Miss Zhang is my English teacher. But she is not Sam’ s teacher. We don’t know her age.。仁爱七上英语期中试卷20
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。