八年级上学期期中测试内容摘要:

B. either C .but D. and 6. A. fatter B. shorter C. stronger D. longer 7. A. His B. He C. Her D. She 8. A. exercise B. homework C. shopping D. housework 9. A. drink B. buy C. eat D. cook 10. A. that B. they C. what D. them 三、阅读 理解 To Be Famous Chopin(肖邦 ) was born in March,1810, near Warsaw(华沙) in Poland. He was one of the greatest musicians in the world. In 1831, when he went to Paris, no people but he could play the piano very well. At that time people in Paris liked the Hungarian(匈牙利的) pianist Liszt(李斯特) . One night, at a concert, Liszt went to the piano and all the people shouted. As all the lights in the concert were turned off, a wonderful piano concert started. The music was so good that the listeners were all greatly interested. They kept praising the pianist and thought that Liszt reached something new in playing the piano. Suddenly, all the lights were turned on again as the music came to an e。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。