七年级英语module4healthyfoodunit1教学设计内容摘要:
es. Label the food and drink. 3. Read the words after the teacher. 4. Introduce the new words. Step 3 听力练习 整体感知 1. Play the recording , Check (√ )the food and drink Betty and her mother have got. then they can check their answer with a partner. 2. Call back the answer from the whole class and check the answer. Step 4 问题引领 再读课文 1. Play the recording and ask the students to listen and read after the conversation. Then talk about Tony’s shopping. 2. Ask。七年级英语module4healthyfoodunit1教学设计
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。