八年级上期末测试内容摘要:
with a box full of Christmas cards. All of them had addresses and stamps on them. Mrs Smith was surprised. “These are for last year,” he said to her. “I fot to post them all. ” ( ) 1. This story happened on__________. A. December 25 B. November 25 C. January 15 D. December 11 ( ) 2. Mrs Smith was_________write the cards. A. too free to B. so busy that she had no time to C. not busy enough to D. so free that she couldn’t ( ) 3. Mrs Smith was very angry with Mr. Smith because__________. A. he worked there B. he said nothing C. he didn’t want to write the Christmas cards D. he fot to post the old cards ( ) 4. There was a box filled with Christmas cards__________. A. in his study B. in the livingroom C. out of his study D. out of the livingroom ( ) 5. Which of the following is wrong? A. Mr Smith was perhaps(也许) working while his wife bought the cards. B. The cards would only be sent to Mr Smith’s friends. C. The cards would be sent to Mr and Mrs Smith’s friends. D. Mr Smith didn’t remember to send the cards last year. B Tom and Simon were Americans. Once they visited Spain. One day they came into a little restaurant for lunch. They did not know Spanish(西班牙语) , and the waiter did not know their American English, either. They wanted the waiter to understand that they needed some milk and eggs. At first Tom read the word “milk”many times. Then Simon spelled it on the table. But the waiter could not understand them at all. At last Tom took out of a pi。八年级上期末测试
相关推荐
直接刺激 B 体内的直接刺激 C 神经传来的兴奋 D 其它组织传来的兴奋 下列关于动物先天性行为的叙述中,错误的是( ) A 所有的动物都有 B 动物生来就有的行为 C 是可以遗传的 D 在同种动物的不同个体间有不同的表现 有些蛾初羽化时只靠嗅觉来找食物,因此不能找到无味的花,但当它采过无味的花后,就建立了视觉和事物之间的联系,以后就能采无味的花了,这种行为称为( ) A 学习行为 B 取食行为
完成课后作业二,体会词语的精确、生动和感情色彩。 第二课时:探究、学习 以《解放南阳》为例,巩固对新闻结构的认识。 标题:人物 —— 中原我军;事件:解放南阳。 (迅速了解) 导语:扩展内容 —— 守敌;时间;弃城。 (比较详细了解) 主体:历史背景、目前形势、未来发展。 (更为细致了解) 电头:报社名称、发稿地点、发稿时间。 划分两文主体部分的层次,进一步学习文章内容的层次安排。 《横渡长江》
又对于突破本课的难点 —— 让学生认识中国的抗战时“全民族的抗战”,至关重要,所以我将这一目调整在第一目之后,这样,本课重组后的顺序变为:一、南京大屠杀;二、卢沟桥事变;三、共赴国难。 为了让学生更加 形象感知历史,我将《卢沟桥事变》和《南京大屠杀》的视频资源还有相关图片纳入教材。 六 、 教法 本着 “ 学生是教学活动的出发点,也是教学活动的落脚点 ” 教学理念,结合学生学情
第 二 节: 气候 冬季南北温差大,夏季普遍高温 我国冬季气温分布南北温差大,大部分地区 1 月平均气温由南向北逐渐降低, 1 月 0OC等温线大致沿秦岭-淮河一线分布。 我国夏季大部分地区普遍高温,青藏高原气温相对较低。 我国冬季最冷的地方是黑龙江省漠河县的北极村,夏季最热的地方是新疆的吐鲁番。 我国气候带的划分:根据气温的南北差异,结合农业生产的实际,将我国从北到南划分为:寒温带、中温带
Searching some good ways to remember new words. Step 2 Presentation(10 minutes) 1. Finish 1a. Ask students to read 1a, then get the main idea of the passage and underline the new words: “change, side