九种英语同义句转换内容摘要:

在完成时态, “for 时间段 ”表示 “持续(一段时间) ”,常用在含有现在完成时态的句子里。 3. Mr Li joined the Party twenty years ago. Mr Li _____ _____ _____ the Party for twenty years. 答案: has been in 解析:短暂动词 join,意为 “参加、加入(组织,政党 ) ”,不能与延续时间状语连用,与延续性时间状语连用时,将 join 改成 be in 或 be a member in…。 5 运用不同引语进行转换 即将直接引语变为间接引语或将间接引语转换成直接引语。 此时还要注意相关时态、人称、动词、状语等相应的变化。 如: 1.“I’ve found my wallet,” he said to me. He _________ me that he _________ _________ his wallet. 答案: told, had found 解析:此题是将直接引 语转换成间接引语。 2. “Did you see her last week?” he said. He _______ _______ I had seen her the week _______. 答案: asked if/ whether, before 解析:此题是将疑问句的直接引语转换成间接引语。 6 简单句与复合句之间的转换 即将简单句变成同义的复合句或将复合句变成同义的简单句。 如: 1. We didn’t go out for a walk because it was raining. We didn’t go out for a walk _______ _______ the rain. 答案: because of 解析:将原因状语从句 because it was raining 改为表示原因的介词短语 because of the rain。 2. He was so excited that he couldn’t go to sleep. He was ______ ______ ______ go to sleep. 答案: too。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。