不进位加法例1内容摘要:

idn’ t go to the meeting. Instead, he went to the _______________ 由此可见, instead和 instead of的区别在于____________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ 6. none pron. 译_________________ 全部 译_________________ none与 all的关系类同于_____________和______________ 请翻译以下句子: All of the students have been to the ____________________________ All of the students have not been to the _________________________ None of the students have/has been to the _______________________ Both of them are ___________________________________________ Both of them are not ________________________________________ Neither of them is a _________________________________________ 请注意黑体斜体部分哦。 请翻译以下词组: 所有书本 ________________________ 大部分书本___________________________ 一些书本_________________________ 没有一本书 ___________________________ 所有学校_________________________ 大部分学校____________________________ 一些学校_________________________ 没有一所学校__________________________ 7. perhaps adv. 译 ____________ 它的同义词有___________________________________________ 8. traffic jam 译 _____________ 是个 __________________(可数、不可数)名词。 traffic 译 _________________是个 __________________(可数、不可数)。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。