建筑给水排水毕业设计专业外文翻译内容摘要:
f trap seal depletion and the opportunity that exists for recharge on appliance discharge allow 25% depletion. The boundary equation may also be determined by local conditions: the AAV opening and subsequent loss coefficient depends on the local line pressure prediction. Empirical data identifies the AAV opening pressure, its loss coefficient during opening and at the fully open condition. Appliance trap seal oscillation is treated as a boundary condition dependent on local pressure. Deflection of the trap seal to allow an airpath to, or from, the appliance or displacement leading to oscillation alone may both be modelled. Reductions in trap seal water mass during the transient interaction must also be included. 3. Role of diversity in system operation In plex building drainage works the operation of the system appliances to discharge water to the work, and hence provide the conditions necessary for air entrainment and pressure transient propagation, is entirely random. No two systems will be identical in terms of their usage at any time. This diversity of operation implies that interstack venting paths will be established if the individual stacks within a plex building work are themselves interconnected. It is proposed that this diversity is utilized to provide venting and to allow serious consideration to be given to sealed drainage systems. In order to fully implement a sealed building drainage and vent system it would be necessary for the negative transients to be alleviated by drawing air into the work from a secure space and not from the external atmosphere. This may be achieved by the use of air admittance valves or at a predetermined location within the building, for example an accessible loft space. Similarly, it would be necessary to attenuate positive air pressure transients by means of PAPA devices. Initially it might be considered that this would be problematic as positive pressure could build within the PAPA installations and therefore negate their ability to absorb transient airflows. This may again be avoided by linking the vertical stacks in a plex building and utilizing the diversity of use inherent in building drainage systems as this will ensure that PAPA pressures are themselves alleviated by allowing trapped air to vent through the interconnected stacks to the sewer work. Diversity also protects the proposed sealed system from sewer driven overpressure and positive transients. A plex building will be interconnected to the main sewer work via a number of connecting smaller bore drains. Adverse pressure conditions will be distributed and the work interconnection will continue to provide venting routes. These concepts will be demonstrated by a multistack work. 4. Simulation of the operation of a multistack sealed building drainage and vent system Fig. 3 illustrates a fourstack work. The four stacks are linked at high level by a manifold leading to a PAPA and AAV installation. Water downflows in any stack generate negative transients that deflate the PAPA and open the AAV to provide an airflow into the work and out to the sewer system. Positive pressure generated by either stack surcharge or sewer transients are attenuated by the PAPA and by the diversity of use that allows one stacktosewer route to act as a relief route for the other stacks. (37K) Fig. 3. Four stack building drainage and vent system to demonstrate the viability of a sealed building system. The work illustrated has an overall height of 12 m. Pressure transients generated within the work will propagate at the acoustic velocity in air . This implies pipe periods, from stack base to PAPA of approximately s and from stack base to stack base of approximately s. In order to simplify the output from the simulation no local trap seal protection is included—for example the traps could be fitted with either or both an AAV and PAPA as examples of active control. Traditional works would of course include passive venting where separate vent stacks would be provided to atmosphere, however a sealed building would dispense with this venting arrangement. Ideally the four sewer connections shown should be to separate collection drains so that diversity in the sewer work also acts to aid system self venting. In a plex building this requirement would not be arduous and would in all probability be the norm. It is envisaged that the stack connections to the sewer work would be distributed and would be to a below ground drainage work that increased in diameter downstream. Other connections to the work would in all probability be from buildings that included the more traditional open vent system design so that a further level of diversity is added to offset any downstream sewer surcharge events of long duration. Similar considerations led to the current design guidance for dwellings. It is stressed that the work illustrated is representative of plex building drainage works. The simulation will allow a range of appliance discharge and sewer imposed transient conditions to be investigated. The following appliance discharges and imposed sewer transients are considered: 1. . discharge to stacks 1–3 over a period 1–6 s and a separate . discharge to stack 4 between 2 and 7 s. 2. A minimum water flow in each stack continues throughout the simulation, set at l/s, to represent trailing water following earlier multiple appliance discharges. 3. A 1 s duration stack base surcharge event is assumed to occur in stack 1 at s. 4. Sequential sewer transients imposed at the base of each stack in turn for s from 12 to 18 s. The simulation will demonstrate the efficacy of both the concept of active surge control and interstack venting in enabling the system to be sealed, . to have no high level roof perations and no vent stacks open to atmosphere outside the。建筑给水排水毕业设计专业外文翻译
相关推荐
CuCl2和 HCl 的混合溶液中加入过量 NaOH 溶液 D. 向两份同体积和同质量分数的 HCl 溶液中分别加入足量的铁粉和镁粉 19.下列 4个图象分别代表对 应的 4种过程,其中正确的是( ) A.分别加热等质量的氯酸钾与高锰酸钾,反应过程中生成氧气的质量变化 B.向含有盐酸的氯化铜溶液中滴加烧碱溶液,产生沉淀的质量变化 C.向盛有 1Og 氧化钠固体的烧杯中加水配成 100g 溶液
有深有浅,有的鲜艳有的不鲜艳。 纯度: 指色彩的纯净程度,也称为饱和度。 鲜 灰 小结 色相、明度、纯度 在色彩中极为重要被称为色彩三要素。 练一练 大客车的车身色彩很丰富,有多种色相、明度、纯度的变化才能达到这种效果,试从车身上找出所有色相。 冷和暖是我们人体对外界的一种感觉,引申一下,色彩的冷
1、高中物理资源下载平台世昌的博客 (一)理科综合试题本试卷分第卷(选择题)和第卷(非选择题)两部分,其中第卷第 3341 题为选考题,其它题为必考题。 考生作答时,将答案答在答题卡上,在本试卷上答题无效。 考试结束后,将本试卷和答题卡一并交回。 注意事项:1、答题前,考生务必先将自己的姓名、准考证号填写在答题卡上,认真核对条形码上的姓名、准考证号,并将条形码粘贴在答题卡上的指定位置上。 2
)混凝土外观质量保证措施 专门明确工程外观质量责任人,由其具 体负责外观质量对直接影响外观质量的作业人员,包括模板工、振捣工、水泥工等主要求技术工人进行培训,使他们清楚要点,掌握正确的操作方法。 对可能会影响外观质量的问题,如麻面、气孔、冷缝、色泽不一等,要事先制定预防措施,明确外观质量要求,采取细致有效的技术处理措施对策,研究施工工艺,加大技术力量投入,加强技术管理,并具体落实责任到人
1、高中物理资源下载平台世昌的博客 ,高血脂人群相对增多。 脂类在血液中以随着生活水平的提高和生活方式的改变,高血脂人群相对增多。 脂类在血液中以脂蛋白的形式进行运送,并可与细胞膜上存在的特异性受体相结合,进入细胞内进行代谢(如图所示)。 对该该图分析不合理的是( ) )化、是 段时间后,测定叶腋内激素水平和统计单株平均分蘖数,绘制如下图。 下列有关实验结论的叙述中,正确的是 (