基于单片机温度监测系统设计的外文翻译内容摘要:
ry, ATMEL AT89C51 is a kind of high efficient micro controller, AT89C2051 is a streamlined version. AT89C 51microcontroller as many embedded control system .Arrange appearance and pin as shown in figure 12 shown DS1820 DS1820 DS1820 DS1820 AT89C51 MCU Display element Button control unit 第 4 页 12 AT89C51 pins figure Major features: and MCS 51 patible 4K bytes programmable FLASH memory life: 1000 write/wipe cycle data retention time: 10 years the static job: 0Hz 24MHz level 3 program memory lock 128 x 8 bits internal RAM 32 programmable I/O lines two 16 timer 5 interrupt source programmable serial channels low power consumption of idle and power lost mode piece inside oscillator and clock circuit Tube feet explains: VCC: power supply voltage. GND: grounded. P0 Mouth: P0 mouth a eight leak level twoway I/O mouth open, every foot can absorb 8TTL gate current. When the pipe mouth P0 feet first write 1, defined as high resistance input. P0 can be used for 第 5 页 external program data storage, it can be defined as the eighth data/address. In FIASH programming, P0 mouth as the sourcecode input port, when FIASH check, the sourcecode P0 output, when P0 external must be pulled. P1 mouth: mouth is an internal P1 provide pullup resistors 8bit twoway I/O mouth, P1 mouth buffer can receive 4TTL gate current output. P1 mouth tube feet, was then write 1 for high, pull up inside can be used as input, P1 mouth be external pull down for low electricity at ordinary times, will output current, this is due to internal pull up sake. In FLASH programming and calibration, P1 mouth as eighth address to receive. P2 mouth: for an internal P2 mouth on the 8bit pullup resistors twoway I/O port, P2 mouth to receive, the output buffer 4 TTL gate current, when P2 mouth is written 1, its tube feet are internal pullup resistors, and push as input. And so as the input, P2 mouth feet are external down tube, will output current. This is due to internal pull up sake. P2 mouth when used external program memory or 16 address external data memory access, P2 mouth high output address eight. In a given address 1, it using internal and external 8 address advantage, when for reading and writing data memory, P2 when the special function registers mouth output of content. P2 mouth in FLASH programming and the calibration eight address when receiving high signal and control signals. P3 mouth: P3 mouth pipe is 8 feet with internal pullup resistors twoway I/O port, may receive four TTL gate current out put. When P3 mouth writing 1, they are internal and high level, and used as input. As input, due to external dropdown for low level, P3 mouth will output current (ILL) this is due to pull up39。 s sake. RST: reset input. When oscillator reset device to keep RST feet high level two machine cycle time. ALE/PROG: when access external storage, address latch allows the output level o。基于单片机温度监测系统设计的外文翻译
相关推荐
输出不同的电压,通过对电压进行 AD 转换之后就可以判 断键值。 ADC 键盘电路如 图 33 所示: 图 33 ADC键盘电路 设计 ADC 键盘电路时主要有两个问题,第一 个是电阻阻值问题,即如何让不同的按键按下之后, 输出 电压 的差值尽可能大 ,以便于区分。 第二个是无按键按下时,电压输出端是接地还是悬空 ,即如图 32 所示中,电阻 R26 是接在 R10 左端还是如上图接在开关 S2
过实施国家农业综合项目,对中低产田进行全面改造,彻底改变农业基础条件,大幅度提高农业生产力,为农业可持续发展和 建设 社会主义新农村打下坚实 的 基础。 从根本上改善农业基础条件,提高 农业综合 生产 能力。 项目区自然降水时空分布不均,现有水利设施量少质差,重点水利工程不配套,水资源不能合理充分利用是影响优质高效农业发展和农民增收的最大障碍。 因此,开发水资源,增加水利设施刻不容缓。
1、高中物理资源下载平台世昌的博客 (选择题)和第 (非选择题)两部分。 全卷满分 300 分。 考试时间 150分钟可能用到的相对原子质量:4 7 0 4第 I 卷(选择题,共 126 分)一、选择题:本题共 13 小题,每小题 6 分,在每小题给出的四个选项中,只有一项是符合题目要求的。 1下列关于人体细胞结构和功能叙述正确的是A
1、高中物理资源下载平台世昌的博客 内质网 生成类囊体 合成种植物)叶片上的气孔白天关闭、夜晚开放。 为研究其光合作用特点,将落地生根的叶片进行离体培养,在光、暗交替条件下分别测定叶片内的淀粉、果如右图。 据此作出的推测,研究食蚊鱼对本地物种唐鱼的捕食作用,研究者分别观察雌、雄食蚊鱼对不同日龄唐鱼的仔鱼(8d、20d)和幼鱼(55d)的捕食作用,结果见下图。 分布 观察低温诱导细胞染色体数目加倍
1、高中物理资源下载平台世昌的博客 :欧剑雄(审核人:陈国文 方青凡) 郑燕钦 高三生物备课组本试卷分选择题和非选择题两部分,共 40 题,满分 300 分,考试时间 150 分钟。 注意事项:1答选择题前,请考生务必将自己的学校、姓名、准考证号、座位号、考试科目等内容涂(填)写在答题卡和答题卷上相应的位置。 2选择题每小题选出答案后,用 2B 铅笔将答题卡上对应题目的答案标号涂黑,如需涂改
1、高中物理资源下载平台世昌的博客 (物相对量43210北京市西城区 2016 年高三二模试卷理科综合能力测试 择题 1,非选择题 6,共 300 分。 考试时长 150 分钟。 考生务必将答案填写在答题卡上和答题纸的相应区域内,在试卷上作答无效。 考试结束后,将本试卷及答题卡和答题纸一并交回。 可能用到的相对原子质量: 生物选择题(共 20 题 每小题 6 分 共 120