10mev、10kw电子辐照加速器可行性分析报告内容摘要:
nf r ar ed r adiat ion equipm ent or f ences and elect r onic equipm ent as well as video sur veilance equipm ent , t he specifc needs of t he equipm ent and m at erials quant it ies we wil l det ail lat er . 1. 4 t he pr ogr am m e accor ding t o your pany39。 s sit e t o see and list en t o t he leader ship pr oposal, and in accor dance wit h t he act ual needs of t he pr oject, wit h r ef er ence t o t he r elevant int er nat ional st andar ds and nat ional st andards, bined wit h t he exper ience accum ulat ed by t he pany engaged in m ult iple pr oj ect s, pr epar e t he t echnol gy package. I f t he content s or any ot her aspect of t he pr ogr am me has not det ailed wher e we wel e your valuable m ents. Second, t he design pr inciples of t he pr oj ect design f olows t echnology advanced, f unctional, st able and cost saving pr inciples. And consider ing const r uct ion, m aint enance and oper at ion, and f or f ut ur e developm ent, expansion, r econst r uction and ot her f act or s leave r oom f or expansion. Design elem ent s of t he syst em is t he syst em at ic, int egrat ed and pr ehensive。 design has t he scientif icit y, r easonabilt y and oper abilt y. I ts has f olowing pr inciples: 2. 1, and advanced and applicabilt y used cur r ent ly m ost advanced of soft , and har dware and t he work t echnology, err ors r ate low, pat ible sex st rong, upgr ade easy, used m odule t ype st ructur e, expansion convenient , no r epeat constr uct ion invest ment, syst em of t echnology perf orm ance and qualit y index should r eached int er national leading level。 while, syst em of inst alat ion debugging, and soft ware pr ogram ming and oper at ion using and should sim ple, easy m ast er, f or China condit ions and t his proj ect of f eat ures. Set t he num ber of advanced t echnology in a t he syst em s, r eflect s t he cur rent level of t he lat est developm ent of put er and wor k t echnology, adapted t o t he r equir ements of t he tim es. While t he system is t he syst em used f or various m anagement levels, it s funct ions ar e configur ed t o provide t he user wit h f or t able, safe, f ast and convenient t o 3. 1, t he int elligent building design st andar ds ( GB/t 50314 200) , t he design st andar d f or int elligent building syst em s engineer ing ( DB32/191 198) , t he code f or engineer ing design of gener ic cabling syst em f or cit y r esidential buildings ( CECS/1192020) 3. 4, code f or design of buildings and cam pus cable system s engineer ing ( GB/T50311 200) , t he code f or electr ical design of civil buildings ( J GJ / T16 92) 3. 6, t he code f or civil closed cir cuit m onit oring TV system engineer ing t echnology ( GB/5019894) 3. 7, t he t ypes of syst em ear thing and saf ety t echnical r equir ement s ( GB14050 93) 3. 8, of t he secur it y engineer ing pr ocedures and r equir em ent s ( GA/T7594) , t he r ules of secur it y engineer ing accept ance ( GA/T308 201) , t he indust rial design of TV syst em code ( GBJ 115) , t he Securit y checks pr event ion syst em pass for gr aphics s ymbol ( GA/7494) 3. 12, and f ir e linkage contr ol equipm ent Gener al t echnology condit ions ( GB 16806 197) four , and system f unction and f eat ur es in system bot h advanced, and pr actical, and m atur e, and r eliable, and do system open, and can ext ended sex good, bot h investment r easonable, and benef it s best of pur pose, bor der secur it y alar m syst em on sit e equipm ent f or concentr ated m onit or ed, and contr ol and m anagement , m akes t hese equipm ent o secur it y, and r eliable, and ef ficient t o r un, M aximize int elligent m anagem ent r ole t o cr eat e a safe, healt hy, for table and pleasant, and t o im prove t he eff iciency of a good envir onment and save ener gy, and r educe maint enance per sonnel. According t o t he pr oject39。 s envir onmental needs, and engagement functions t o est ablish t he pr oj ect boundar y secur it y alar m syst em, in a Wor d, t his boundary is a pr oj ect of t he securit y alar m syst em is highly aut om ated and ef ficient hospit alit y f or a f ort able, convenient, and highly secure envir onment . Five, schem e design based on design pr inciples, design specifcat ions and accor ding t o int ernat ional and dom est ic standards, and in accor dance wit h user needs, as well as dr awings and r elat ed inf ormation pr ovided by, and j oining t he pr oject39。 s act ual sit uation and f ut ure development t rends, bor der secur it y alar m systems f or t he pr oject design. 5. 1. pr inciple of syst em and bur glar alar m syst em f r om det ect ors, r egional dir ect or s, and t he alar m cont rol cent re posed of thr ee part s. I ts pr inciples as in t he f olowing char t : detector s f or bur glar alar m syst em is inside and out side t he building in key ar eas, im port ant places, pr ot ect ion, when t he pr obe t o ilegal invader s, t he signal t r ansmit ted t o t he alar m contr ol: sound and light alar m , display address, about he per son on dut y af ter r eceiving t he alar m, t ake m easur es according t o t he sit uat ion, t o cont rol t he developm ent of t he sit uat ion. Ant i t heft alar m syst em alar m funct ion in addit ion t o t he above, t here is linkage f unct ion. Such as: open t he alar m light ( including inf r ar ed lam p), int eractive audio and video m at r ix contr oler , swit ch on t he alar m cam er a on t he spot, mat rix cont roler TV ser ies of contr ol: monit or displays an im age, video f oot age, mult imedia cont roler aut omat ic or human . . t he thr ee guar antees per iod war r anty 1, war ranty 1) service per iod f rom date of accept ance of engineer ing, a 1 year war r anty, war ranty pr ocessing is pleted wit hin t he r esponse t im e is 48 hour s. 2) service wit hin t he war r anty per iod, we all accesso。10mev、10kw电子辐照加速器可行性分析报告
相关推荐
第 15 页 共 72 页 ~S = (3+)(1+5%)5 = + (4)根据 Tmax = 3500h,,查图 3- 1得 Jec = (A/mm2) (5)计算导线经济截面积: n=2 √ P2+Q2 (√ +) 103 Sj = ———— = —————————— = mm2 2√ 3 UN Jec 2 10 查附表 1- 21 选取导线规格为 2 回 LGJ- 95/20
性、休闲性的各大功能全方位的展现给世人。 第五章 市场分析与营运 一、客源市场分析 近年来,马鞍山接待旅游者逐年增长,根据安徽马鞍山旅游统计数据得知,旅游客源市场以国内游客为主,境外游客为辅。 从旅游接待人数、客源结构、消费结构等方面看,某 寺的旅游潜力很大,但需要加强旅游区规划和基础设施建设,不断开拓市场,加大宣传促销力度,实现游客量的快速增加。 构建“和谐社会”已成为马鞍山发展 社会
患者住院文档 ( d) 药房取药数据流图: 处方单文档 处方单号 未取药 药品信息 药品库存文档 数据字典 取患者住院数据 预交是否足够 从预交款中扣除 取患者住院数据 预交是否足够 扣除费用 补足费用 出院操作 取处方单数据 药品出库 清除信息 毕业论文 HIS 住院管理子系统 13 1 数据表项目 下面给出的是本人所涉及到的所有数据表项目。 1. 住院 病床表 文件名称:住院病床 简述
势平坦 ,水源充沛 ,基础设施配套齐全 ,是建设冷库的理想地址。 发展蔬菜储藏加工业 ,以国际市场和国内大中城市等消费市场为依托 ,市场销售有可靠保障。 丰富的蔬菜资源和良好 的生态环境为绿色优质蔬菜加工提供了可靠的资源和环境保证。 技术优势 本项目引进国内雪洋先进的技术和新工艺 ,实现蔬菜储存、保鲜 ,运输各个环节的标准化操作。 群众参与优势 公司生产规模不断扩大 ,在当地有良好的企业形象
是经济、生态、社会效益最佳结合的经济林植物,是改善地区生态环境、加快农民脱贫致富最适宜的品种和最适合公司运作或机构投资的项目。 加工技术优势 目前国内外玫瑰精油加 工一直沿用传统的水蒸气蒸馏法提取工艺,玫瑰花的出油率约为 %左右, 2500 公斤花瓣才能提炼 1 公斤玫瑰精油。 该项目可采用先进的超临界 CO2流体萃取或生物制剂提取等高新技术和设备提 7 取,出油率提高可一倍,达到 %,提炼 1
签名: 三、 生产分析(由生产 部从产线负荷、设备、人员等方面进行评价 ) 签名: 结论: 四、采购分析(由采购填写) 采购周期最长的零件 /部件名称: 周期: 天 是否有采购难点。 是 □ 否 □ 说明: 采购成本 是否可达