土木工程抗侧向荷载的结构体系英文外文文献翻译毕业设计论文内容摘要:
lication in buildings perhaps 40stories and higher. However, except for possible aesthetic considerations, belt trusses interfere with nearly every building function associated with the outside wall。 the trusses are placed often at mechanical floors, mush to the disapproval of the designers of the mechanical systems. Nevertheless, as a cost effective structural system, the belt truss works well and will likely find continued approval from designers. Numerous studies have sought to optimize the location of these trusses, with the optimum location very dependent on the number of trusses provided. Experience would indicate, however, that the location of these trusses is provided by the optimization of mechanical systems and by aesthetic considerations, as the economics of the structural system is not highly sensitive to belt truss location. TubeinTube Structures The tubular framing system mobilizes every column in the exterior wall in resisting over turning and shearing forces. The term ‘ tubeintube’ is largely selfexplanatory in that a second ring of columns, the ring surrounding the central service core of the building, is used as an inner framed or braced tube. The purpose of the second tube is to inc rease resistance to over turning and to increase lateral stiffness. The tubes need not be of the same character。 that is, one tube could be framed, while the other could be braced. In considering this system, is important to understand clearly the differen ce between the shear and the flexural ponents of deflection, the terms being taken from beam analogy. In a framed tube, the shear ponent of deflection is associated with the bending deformation of columns and girders (i. e, the webs of the framed tube) while the flexural ponent is associated with the axial shortening and lengthening of columns (, the flanges of the framed tube). In a braced tube, the shear ponent of deflection is associated with the axial deformation of diagonals while the fle xural ponent of deflection is associated with the axial shortening and lengthening of columns. Following beam analogy, if plane surfaces remain plane (, the floor slabs), then axial stresses in the columns of the outer tube, being farther form the neutral axis, will be substantially larger than the axial stresses in the inner tube. However, in the tubeintube design, when optimized, the axial stresses in the inner ring of columns may be as high, or even higher, than the axial stresses in the outer ring. This seeming anomaly is associated with differences in the shearing ponent of stiffness between the two systems. This is easiest to under stand where the inner tube is conceived as a braced (, shear stiff) tube while the outer tube is conceived as a framed (, shearflexible) tube. Core Interactive Structures Core interactive structures are a special case of a tube intube wherein the two tubes are coupled together with some form of three dimensional space frame. Indeed, the system is used often wherein the shear stiffness of the outer tube is zero. The United States Steel Building, P ittsburgh, illustrates the system very well. Here, the inner tube is a braced frame, the outer tube has no shear stiffness, and the two systems are coupled if they w ere considered as systems passing in a straight line from the “hat” structure. Note that the exterior columns would be improperly modeled if they were considered as systems passing in a straight line from the “hat” to the foundations。 these columns are per haps 15% stiffer as they follow the elastic curve of the braced core. Note also that the axial forces associated with the la。土木工程抗侧向荷载的结构体系英文外文文献翻译毕业设计论文
相关推荐
1 436096 15786 横向水平地震作用下的弯矩图、剪力图、轴力图如下图所示: 第 21 页 共 72 页 横向水平地震作用下左地震弯矩图 mN( k ) 图 41 第 22 页 共 72 页 横向水平地震作用下左地震 剪 力图 图 42 第 23 页 共 72 页 横向水平地震作用下左地震 轴 力图 图 43 5内力计算 起的固端弯矩: 顶层: 边跨 (AB)梁: 2211 2 1 .
e most fundamental. Section design From the outset it was recognised that prestressed concrete has to be checked at both the working load and the ultimate load. For steel structures, and those made
1、光世昌老师高中物理精品资源免费下载地址 曲线运动运动的合成与分解一、选择题1. 一条小船在静水中的速度为 10 m/s,要渡过宽度为 60 2014潍 坊 月 考 m、水流速度为 6 m/s 的河流,下列说法正确的是()A小船渡河的最短时间为 6 船渡河的最短时间为 10 小船在静水中的速度增加,则小船渡河的最短路程减小D若小船在静水中的速度增加
and estimated cost of construction for the various plans. The photogrammetric method, which makes use of aerial photographs is used extensively to indicate the character of the terrain on large
protection, makes one week level along the building outer wall to evade the mine belt, between the belt and the belt the vertical range ≤6m, in the outer wall all metal parapet, the windows and doors
1、高中物理资源下载平台世昌的博客 (三十)变压器电能的输送(45 分钟100 分)一、选择题(本题共 10 小题,每小题 7 分,共 70 分。 多选题已在题号后标出)20 V,输出电压为 36 V 的变压器副线圈烧坏。 为获知此变压器原、副线圈匝数,某同学拆下烧坏的副线圈,用绝缘导线在铁芯上新绕了 5 匝线圈,如图所示,然后将原线圈接到 220 V 交流电源上,测得新绕线圈的端电压为 1 V