出租车计价器毕业设计中英文翻译内容摘要:
t terminals J, K and L is shown in Table 1.As a binational circuit we start the design by deriving a set of boolean functions. A possible simplified boolean functions that gives minimum number of inputs to gates may be obtained from Table I.A possible logical diagram that is based on the above derived expressions is shown in Figure 5.It consists of two inverters, four 2input AND, to3input AND two 3input OR gates B. Tavelling Distance Scaling Circuit CT2As shown from the block diagram of Figure 4, the circuit CT2 has four input J, K, L and E and one output M. The function of the circuit is to supply a single pulse at the output M for a certain number of pulses generated at the output of the speed sensor (certain number of meters travelled by the taxicab), according to the number of passengers hiring the car. A suggested fare per kilometer of travelling distance is shown in colomn two of Table 2. the circuit, in this case, should supply a single pulse at the output M for every 100, 125 or 143 pulses generated at the input terminal Eaccording to the level of voltage at input terminale 3, K or L, respectively.Our circuit could be, as shown in Figure 5, three decade counters, connected as a three digit frequency divider whose dividing ratios 100, 125 and 143 are automatically selected by the voltage level at terminals J, K and L, respectively.A possible circuit diagram that may verify the above function is shown in Figure 6. It consists of three decade counters type 7490, one BCDto decimal decoder type 7445, three 4input AND, one 3input ANDone 2input AND two 3input OR gates.C. Time Scaling Circuit CT3As shown in the block diagram, the time scalingcircuit will have four inputs J, K, L and F and one output N. The function of this circuit and accordingto colomn three of Table 2 (fare per 2 minuts of waiting time) is to supply a single pulse at the output N for every 120, 240 or 360 pulses supplied at the input terminal F from the I Hz clock according to level of voltage at inputs J, K and L, respectively.Time scaling circuit would be similar to the distance scaling circuit but with different diving ratios. A Possible circuit diagram is shown in figure 7.It consists, in this case, of three decade counter type 7490, two 3input AND, one 5input AND, one 2input AND one 3input OR gates.D. Circuit CT4 Which Generates Clock Pulses for Display CircuitThe function of this circuit is to supply one, two or three pulses at the output terminal R for each pulse generated at any of the terminals N or M, according to the voltage level at the input terminals J, K or L, respectively. The output P will receive a pulse for each pulse generated at any of the input terminals N or M. This function can be performed by the circuit shown in Figure 8, it consists of one ripple counter type 7493, one half of a dual JK masterslave flipflops circuit type 7476, three inverters, three 2input AND, one 3input AND, one 2input OR and one 3input OR gates. When a pulse is generated at either input terminals N or M, a high level voltage will be generated at the output Q of the flipflop. This will g a t e t h e I Khz signal to be connected to the input A of the ripple counter as well as to the output terminal R. When one, two or three pulses are counted by the ripple counter, according to the level of voltage at the input terminals J, K and L, respectively, a high is generated to reset the counter and change the state of the flipflopsuch that Q bees , the 1 KHz signal is disabled to reach the outputerminal R or the input A of the ripple counter. In order to ensure the proper function of the circuit, the flipflop should be cleared whenever a new channel is operated. This has been achieved by the input 5 and will be explained later when describingthe function of the channels rotary selector switchs.E. Display CircuitAs shown in Figure 2, the display panel would contain three 4digit displays that give the sum of money required from each passenger separately as well as a one sixdigit display that gives the tota。出租车计价器毕业设计中英文翻译
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
出租车公司可行性研究报告
车内装饰 500 18 灭火器 90 18 灭火器 90 19 车载 GPS 500 19 车载 GPS 500 20 合计 77363 20 合计 82790 GPS 和广告方案 项目建设目的和意义
创办民办教育集团项目可行性研究报告
进一步扩大 ,培养更多的综合 素能高的国际型学生 ,为社会经济发展提供强有力的支持服务。 有利于推动省民办教育事业的发展。 建设本项目符合云南省“十一五”规划重点支持项目建设基础教育学校要求 ,是建设 云南省重点龙头示范学校的一项 重要内容。 项目建成后 ,教育集团将通过此平台 ,进行资源共享 ,优化教育资源 ,示范和带动相关行业 ,加快我省中小学优质教育发展步伐
创办社区报的可行性报告
16 个小版,只要 2 个编辑即可。 记者的人数 3个左右。 同时,发动社区居民积极参与提供的内容,比如自拍照片等。 版式 : 最好 是小版,大版式给人感觉不像社区报。 试点区域 选择经济较发达地区的小镇,如珠三角各名 镇,或发达地区县城的城关镇,如东莞的虎门镇、广州的新塘镇、中山的小榄镇、佛山的西南镇 等。 发行 建议 每周五发行 ,既方便居民周末阅读并安排周末活动,也有利于吸引广告。
山东省新人教版物理2013高三单元测试24《波粒二象性》
1、光世昌老师高中物理精品资源免费下载地址 波粒二象性第 I 卷(选择题)一、本题共 15 小题,每小题 4 分,共 60 分在每小题给出的四个选项中,有的小题只有一个选项正确, 分,选不全的得 2 分,有选错或不选的得 0 004 年联合国第 58次大会把 2005 年定为国际物理年爱因斯坦在 100 年前发表了 5 篇重要论文,内容涉及狭义相对论、量子论和统计物理学