数控恒流源设计外文翻译内容摘要:
r 2RZ IVR , since VBE is typically V for a silicon device. (IR2 is also the emitter current and is assumed to be the same as the collector or required load current, provided hFE is sufficiently large). Resistance R1 at resistor R1 is calculated asBZZS IKI VVR *1 ,where, K = to 2 (so that R1 is low enough to ensure adequate IB), (m in)2)(FERECB h IIII ,and hFE(min) is the lowest acceptable current gain for the particular transistor type being used. A more mon current source in integrated circuits is the current mirror. Simple transistor current source with diode pensation Temperature changes will change the output current delivered by the circuit of Figure 3 because VBE is sensitive to temperature. Temperature dependence can be pensated using the circuit of Figure 4 that includes a standard diode D (of the same semiconductor material as the transistor) in series with the Zener diode as shown in the image on the left. The diode drop (VD) tracks the VBE changes due to temperature and thus significantly counteracts temperature dependence of the CCS. Resistance R2 is now calculated as2R2 RBEzz I VVV Since VD = VBE = V, Therefore, BZDZS IKI VVVR *1 . Figure 4 This method is most effective for Zener diodes rated at V or more. For breakdown diodes of less than V, the pensating diode is usually not required because the breakdown mechanism is not as temperature dependent as it is in breakdown diodes above this voltage. Simple transistor current source with LED Another method is to replace the Zener diode with a lightemitting diode LED1 as shown in Figure 5. The LED voltage drop (VD) is now used to derive the constant voltage and also has the additional advantage of tracking (pensating) VBE changes due to temperature. R2 is calculated as 2R2 RBEDI VV ,and R1 as BDDS IKI VV *R1 , where ID is the LED current. Figure 5 Figure 6 Another mon method is to use feedback to set the current and remove the dependence on the Vbe of the transistor. Figure 6 shows a very mon approach using an op amp with the noninverting input connected to a voltage source (such as the Zener in an above example) and the inverting input connected to the same node as the resistor and emitter of the transistor. This way the generated voltage is across the resistor, rather than both the resistor and transistor. (For details, see the article on the ideal op amp the nullor.) The article on current mirror discusses another example of these socalled gainboosted current mirrors. Other practical sources In the case of opamp circuits sometimes it is desired to inject a precisely known current to the inverting input (as an offset of signal input for instance) and a resistor connected between the source voltage and the inverting input will approximate an ideal current source with value V/R. Inductor type current source Amongst other applications, the circuit of Figure 7 using the LM317 voltage regulator is used to present a source of constant current in Class E (switching) electronic amplifiers.。数控恒流源设计外文翻译
相关推荐
1、光世昌老师高中物理精品资源免费下载地址 2015学年第一学期期中考试高二(必修)物理试卷 项选择题:每小题只有一个选项符合题意(本大题 23小题,每小题 3分,共 69分)1关于质点,下列说法正确的是 ( ) A如果物体的形状和大小对所研究的问题属于次要因素时,可把物体看做质点B只有体积很小的物体才能看做质点C质点是理想化模型,实际上并不存在,所以引入质点概念没有多大意义D凡轻小的物体
1、光世昌老师高中物理精品资源免费下载地址 (必修)命题人:杨世乐 石超 审核人:杨世乐 试卷分第卷(选择题)和第卷(非选择题)两部分,全卷满分 100 分,考试时间 75 分钟一、单项选择题:每小题只有一个选项符合题意(本大题 23 小题,每小题 3 分,共 69 分)1在研究下 列问题时 ,能够把 研究对象 看作质 点的 是( ) A研究火车在平直 轨道上运 行时车 轮的转动 B研究神舟七
确定主要就业岗位为 数控设备操作与编程、 机械部件装配与调试 、 电气安装与连接 、数控设备调试与维修 、 设备维护与管理 、 数控设备销售与服务 等。 针对以上就业岗位,为了体现差别化竞争优势和专业特色,本专业 以 数控设备维修为主要培养方向 ,由此确定了本专业的人才培养 规格和 目标。 在此基础上, 系部聘请企业技第四部分 数控设备应用与维护专业建设项目 术与管理一线人员进行岗位工作任务分析
1、高一物理(8 19 班)试卷 第一次考试 共 2 页第 1 页玉山一中 2015年度第二学期高一第一次考试物理试卷(8满分:100 分 考试时间:90 分钟 命题人:尤俊 审题人:吴富生第 I 卷(选择题 共 40 分)一、选择题(本题共 10 小题,每小题 4 分,共计 40 分,1小题只有一个选项符合题意,7小题不只一个答案符合题意。 )1关于曲线运动,下列说法中正确的是(
1、高中物理资源下载平台世昌的博客 ( 4物理试卷2015学 年第 一 学 期一、单项选择题(本题共 8 小题,每小题给出的四个选项中,只有一个选项正确,选对得3 分,选错得 0 分,共 24 分)1下列各组物理量中,都是矢量的是( )A时间、位移、速度 B. 速度、质量、加速度 C. 力、速度的变化、加速度 D. 力、温度、附近海域是渔民祖祖辈辈传统的谋生渔场。 2013年 12 月 16 日
加工位置,保证同一批工件的精度的稳定,容易获得较高的加工精度 和生产效率,广泛使用于中批以上的生产类型。 在铣床夹具中一般有: 平口钳、工艺板等。 由于本设计的零件时长方形零件,故采用平口钳夹具, 在机械加工中,工件的定位和夹紧是相互联系的两个过程。 工件在定位元件上定位好后,还需要采用一些装置将工件牢固地压紧,防止工件在切削力、工件重力、离心力的作用下发生位移或振动,以保证加工质量和安全生产。