形容词比较级练习题无答案内容摘要:

s not as ___________ (tall) as Yongxian. 13. Almost students39。 faces are the same but Li Deming looks _________ (fat) than before the holidays, is _________ (heavy),a hen or a chicken? 15. How _________ (tall) is Sally? She39。 s metres _________ (tall). What abodt Xiaoling? She39。 s only metres _________ (tall). She is much _________ (short) than Sally. She is also the _________ (short) girl in the class. 16. He is _________ (bad) at learning maths. He is much _________ (bad) at Chinese and he is the _________ (bad) at English. 17. Annie says Sally is the ________ (kind) person in the world. 18. He is one of the_________(friendly) people in the class, I think. 19. A horse is a little _________ (big) than a sheep, but much _________ (small) than an elephant. 20. The Changjiang River is _________ (long) river in China. 21. Joy is a little _________ (beautiful) than Betty. room is not as _________ (big) as my brother39。 s. 23. How difficult is physics? I39。 m not sure. Is it _________ (difficult) than maths? I don39。 t think so. 24. Annie plays the piano very ___________ (well). Sue plays it _________ (well) than Annie. And Sally plays it the __________ (well). 25. Saturday is my _________ (busy) day in a week. 26。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。