复件定语从句内容摘要:

d person that I have ever worked who with. whom 216。 This is the best film that I have ever seen. 216。 是代词的所有格形式 , 它既可以代人也可以代物。 Please show me the book ( whose cover is red). I saw a woman (whose bag was stolen). 1. I saw a woman . Her bag was stolen . 2. Please show me the book . Its cover is red. 把两句合成一句方法如下:。 从句放在先行词后。 有些情况下只用关系词 that,而不宜用 which 形容词最高级 或 序数词 修饰时 This is the most interesting story( that )I have ever heard. The first meeting( that) we will take part in will be held in the afternoon. all, something, nothing, anything等 不定代词 时 Here is something( that) I will tell you. 人 也有 物 时 ,只能用 that I can remember well the persons and some pictures (that) I see. 定语从句中需注意事项 one of,the one, 或用 little, much, few, no, all, some, any, the only, the very, the same, the last 作修饰时 Is it the one that you want ? I haven’ t got much that I can offer you. 主句 已有 疑问词 who或 which时,用 that Who is the woman that was praised at the meeting? the same, the。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。