小学六年级英语教案module2unit2内容摘要:

Listen to the tape and read after the tape. ③ Let the students remember the words in their own small groups. 3. Watch the parts of the real weather forecast again. Then ask and answer two by two: What’ s the weather like in„ ? It’ s„ What’ s the weather going to be like in_____ tomorrow? It’ s going to________. Step 3: Learn the Text 1. (The teacher says) let’ s listen to the weather forecast of the tape, and then answer the questions. 2. Play the tape and repeat. 3. Ask and answer the que。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。