英语专业八级考试试题原题及答案解析内容摘要:
英语专业八级考试试题原题及答案解析 2012 年英语专业八级真题及参考答案2012) 195 35 n a on be to a is be to to no in s) in to to do in or in A. -(1) _ on - (2) _ - . to in 012 年英语专业八级真题及参考答案- - 3) _ in 4) _ - of - or (5) _ - (6) _: . to 7) _ - as - (8) _ - 9) _ 10) _ : no - a n to on At of be 0 to of to 1. of A. 2012 年英语专业八级真题及参考答案B. of to C. on on D. of in 2. to . to be of B. to be to C. to be D. 3. of A. B. C. D. 4. of of a OT in A. B. C. D. 5. a . B. C. is in D. be in In to 2012 年英语专业八级真题及参考答案 is on At of be 0 to to 6. A. B. An C. A in D. A 350 on At of be 0 to to 7. In by A. B. C. D. 8. of A. To B. To of C. To D. To of 0 on At of be 0 to to 9. to in _ A. 0.6 . 3.4 . 4 D. 3 012 年英语专业八级真题及参考答。英语专业八级考试试题原题及答案解析
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。