外貌特征描述词汇内容摘要:

er eyes were pale green without a touch of hazel, starred with bristly black lashes and slightly tilted at the ends. 她的眼珠子是一味的淡绿色, 不杂一丝儿的茶褐,周围竖着一圈儿粗黑的睫毛,眼角微微有点翘。 Above them, her thick black brows slanted upward, cutting a startling oblique line in her magnoliawhite skin that skin so prized by Southern women and so carefully guarded with bons, veils and mittens against hot Geia suns. 上面斜竖着两撇墨黑的蛾眉,在她那木兰花一般白的皮肤上,划出两条异常惹眼的斜线。 就是她那一身皮肤,也正是南方女人最最喜爱的,谁要长着这样的皮肤,就要拿帽子、面罩、手套之类当心保护着,舍不得让佐治亚那大热的太阳晒黑。 罗切斯特 Rochester 出处:《简 爱》 (Jane Eyre) 作者:夏洛蒂 勃朗特 (Charlotte Bronte) His figure was enveloped in a riding cloak, fur co。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。