振动筛毕业论文外文文献翻译内容摘要:
ating screen is shown in center of gravity, is taken as the origin of a rectangular coordinate system at static equilibrium, in accordance with rigid motion on the plane [12].Simultaneous differential equations in generalized coordinates using center of gravity coordinates,(x,y),and the swing declination angle, θ ,may be written as where M is the mass of the vibrating screen’s the moment of inertia of M relative to the center of gravity,O。 x and y the displacements in the x and y0directionas。 x and y the velocities in the x and y directions’ and y the accelerations in the x and y directions。 is the swing angular displacement。 α the installation angle。 fx,f yond father damping coefficients in the x,y and directions。 x k and k the stiffness coefficients of the supporting spring along the x and y directions。 A0 the amplitude of the exciting force, given by2 0 A =mrω, where r is the radius of eccentricity the mass of the eccentric block and the exciting angular frequency。 L1 and L2 the distances between each supporting spring and the center of gravity’s the distance between the rotating center of the eccentric block and the center of gravity。 and,βthe included angle between the l and x directions. The damping force is rather small and can be neglected. Then Eq. (1) can be simplified to Eq.(2). 4 Motion and screening effect analysis of a vibrating screen with variable elliptical trace Analysis of the motion parameters Multiple degreeoffreedom vibration theory was used to find a stable solution for the forced vibration [13],as follows: When E 2 S 2 +C 2 H 2 +2 ESCH=0, the trace of point D is a line. When E =Sand C =H, the trace of point D is a circle. In general. (6) expresses the equation of an xoy coordinate was rotated γ degrees anticlockwise to give a new set of x ′ oy′coordinates. A standard elliptical equation was then obtained after eliminating D D x y in Eq.(7). From this we know that some points on the screen move in a line or a circle while others move in an ellipse .As long as the relative position of the rotating center of the eccentric block and the center of gravity are properly adjusted, variable elliptical motion of the screen will be obtained .This provides a reasonable throwing index and material delivery velocity and improves screening efficiency. Analysis of motion trace and screening efficiency The stable solution of a vibrating system, in terms of the vibrating screen, can be given by The equations of motion for any point on the vibrating screen are Eq.(8)shows that the center of gravity traces an approximate circle and that the amplitude in the horizontal and vertical directions is between mm and 5 shows how the center of gravity moves in three degrees of gives the angular phase difference between the horizontal and vertical directions as well as the amplitude of the swing angle. 5 Conclusions 1)A new vibrating screen with variable elliptical motion trace was proposed according to the principle of screening process with constant bed points on the vibrating screen trace different elliptical motion pattern agrees well with the ideal motion characteristic for a screening surface. Thus,screening capacity and process efficiency can be increased. 2)A theoretical kinematic analysis of the vibrating。振动筛毕业论文外文文献翻译
相关推荐
)荷载计算理论:不考虑涵洞顶土柱和周围填土间的摩擦力,采用角度分布法计算,半无限弹性体理论核算。 (3)对于埋置式波纹管的计算,如何考虑波纹钢板管与土体的共同作用是问题的关键。 假定波纹管和土体在界面上没有滑移,它们之间的相互作用通过共同的节点位移实现。 当波纹管的柔度达到一定的数值后,稳定问题成为起控制性的因素。 因此采用几何非线性的分析方法,从而能够考虑第二类稳定问题
重 量 (kg/km) 制 造 长 度 (mm) TJ70 70 19179。 618 1500 TJ95 95 19179。 837 1200 TJ120 120 19179。 1058 1000 TJ150 150 19179。 1388 800 铝包钢承力索是铝覆钢线和铝线绞合而成,主要以铝覆钢线中的钢芯部分承受张力,覆铝层和率线载流,导电性能好,机械强度和抗腐蚀性能好。 GJ 表示钢绞线
现在分述如下: ( 1)以 32 为中心的加工表面。 这一组加工表面包括:一个 32 的孔及其倒角,一个滴油孔和一个油槽及其两个端面,其中 32 .,孔及其端面为主要加工表面。 ( 2)以 16 孔为中心的加工表面。 这一组加工表面包括:一个 16 的孔及其倒角,一个 M86H 的螺纹孔。 ( 3)以 16 为中心的加工表面。 这一组加工表面包括:一个 16 的孔深度为 24,一个
;卡特彼勒新的 C 系列挖掘装载机加大了动臂液压缸直径和发动机功率,使举升能力比前任系列提高了 209/ 0,挖掘和装载作业装置的负荷传感液压系统采用变量泵,提高了作业性能,所有的挖掘装载机都配备了 Ride Control 系统,提高了驾驶舒适性, Cat416C 型还具有平行举升功能,通过快换接头,不需离开驾驶室,可在 30 秒内换装各种工作装置。 英国生产挖掘装载机的公司主要有:班福德
论、提高可靠性、延长使用寿命等方面做了大量工作,推广采用有限寿命设计理论,以替代传统的无限寿命设计理论和方法,并将疲劳损伤累积理论、断裂力学、有限元法、优化设计、电子计算机控制的电液伺服疲劳实验技术、疲劳强度分析方法等先进技术应用于液压挖掘机的强度研究,提高了产品质量和竞争力。 随着大型CAE软件的日渐成熟,虚拟设计技术和计算机仿真技术也被液压挖掘机的设计过程中。
件安装在高压罐 2,其中分别安装有接触器,继电器等。 机床柱后面有 7机数控柜,即机床数控系统。 控制纵向行程极 限的是 8, 11的保护开关。 9 块铁用于设置纵向参考点。 主轴正、反向由主轴变速手柄和手动所操控,这位于编号 5 的面板上,其中有包括停止、切削液停止在内的等多种加工模式和控制过程。 图 22 攻丝机外观图 毕业设计 (论文 ) 8 振动攻丝 机的主要技术参数