plc毕业设计说明书外文文献翻译内容摘要:
, in turn, to deal with the interruption of work (the interruption of services operating procedures). Pending End interruption, and return to the original operational procedures. Which control needs to be addressed, which went for the interruption? Which has no treatment, will not be ignored. Clearly, the interruption of ways and scanning mode is different. Interruption in the form of puter to be utilized to the full, urgent tasks are to be dealt with in a timely manner. However, if at the same time to deal with several tasks that must be done? Priority will also be much easier to highlevel, low? Care less than it might appear. Therefore, the interruption of work is not suited to the daily use of the site. However, PLC scanning method is used mainly in cases of exclusion or suspension. Namely, a large number of controls by scanning all manner of dealing with individual needs, allowing the interruption of scanning operation procedures, turn to deal with it. This can be done taking into account all the control。 the individual can carry out emergency treatment. Actually the process of PLC is more plex than we mentioned here, the analysis of its basic tes, some theoretical issues. If the personnel on the above can enter a change, physical realization information processing, I/O call Cumming space, time scanning method supplemented by the interruption, as a way to study and understand it, and good understanding of PLC is how to achieve control and good grasp of the basic principles of PLC points. For more indepth, in the further course of study, will make a specific presentation. 5 Programmable Controller Basic Characteristics The operating principles are those from the discussion of PLC, PLC’s input and output are mutually separated in physics, which is linked to its existing storage operation on the procedures to achieve. It into a relevant, and not rely on physics, not a line。 But by the information process, using soft logic links. Its work is based on the use of good information. Information is material and energy with its own laws. Facilitate the processing of information, facilitate munication and facilitate storage。 Information may also be trusted, and so on. It is precisely because of these characteristics of information, decisions of the basic characteristics of the PLC. The examples of PLC’s four characteristics are as follow: Functional Rich PLC functions are very rich. This was mainly related to the processing of information rich store of information systems and internal directives devices. Scores up its mand。 several hundred may be a logic problem for all types of data processing also. Where ordinary puter can do, it can be done. Its internal devices that exist in the data storage area is a wide range of capacity ambitious. I/O relays can be used to store input, a point of information, fewer scores, and more up to thousands and tens of thousands or even ten thousands. This means that it can carry out so many I/O points into and out of information used for such largescale control. Its internal various relays, representing intermediate relays, the number more. A place can exist as an intermediate relays, how much! Its counter, timer and many are relay circuits are far behind. Minor modifications or modules, and its internal timer, and can reach 100 meters, thousands. This is because as long as the word that will be used exists, and some signs spaces bee timer, counter, so it is that much. Furthermore, these internal device must be installed into electricity maintained, or not maintained we call that the call for the replacement of the. Use to meet different requirements. These pieces are also relays difficult to achieve. Its data can be used to store large data storage area, hundreds, thousands and tens of information can be kept, and not after the loss of electricity. PLC is rich external equipment may establish friendly puter interface for the exchange of information. Could into procedures into data readable by the procedures read? And reading and writing in the book, the screen. Data read out, it can dumps can print. Data entry into can to the card reading, and so on. PLC has munications interfaces with the puter link or working, exchange of information and puters. Networking can do it itself to form a single aircraft that cannot have greater, broader geographical control system. PLC also includes powerful functions could be carried out since the diagnosis. The results can be automatically recorded. This increased transparency for its maintenance, facilitated. Rich functions for the PLC to provide a wide range of applications possible。 At the same time, also for industrial automation systems, and control much of the intelligent move created conditions. Collection rich in functions such as PLC who is notcall controls。 More traditional relay control circuits are inparable. Userfriendly PLC control system used to achieve it is very convenient. This is because: first PLC control logic established procedures, the procedures used to replace hardware wiring. Series of procedures than wiring change procedures than changes wiring of course easier! Secondly PLC hardware is highly integrated, has integrated modules for various miniaturization. Furthermore, these modules are plementary, have achieved mass production and standardization. Various control systems for modular PLC manufacturers have more cash supply, the market can be bought. Therefore, the hardware system configuration and construction are also very convenient. For this reason, using programmable controller is the word may. For software stresses that its procedures may be also be incorporated. Stresses on hardware, its configuration variable, but also easy to change. Specifically, the PLC gains five convenient points:。plc毕业设计说明书外文文献翻译
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
pc钢棒生产线项目可行性研究报告
,需要经验且调节十分繁琐,通过对该电路的深入分析和改进,大大简化负载更换后引前角调节工作,只需调节一个电位器就能决定引前角大小,并且调节是线性单调递增,极大地适应了现场调节。 ③全固态中频电源逆变控制具有逆变器定角控制功能,在负载工况变化时能保持逆变器容性工作角度不变,具有非常宽的频率适用范围。 ④采用大板结构,将控制电源和控制电路集中在一块板上,大大简化外部联线,减少故障点,极大地便于维护。
plc毕业设计论文题目
成的 BTL功率放大器的设计 326. 超声波测距器设计 327. 415V直流电源设计 328. 家用对讲机的设计 329. 流速及转速电路的设计 330. 基于单片机的家电远程控制系统设计 331. 万年历的设计 332. 单片机与计算机 USB接口通信 333. LCD数字式温度湿度测量计 334. 逆变电源设计 335. 基于单片机的电火箱调温器 336. 表面贴片技术
oracle—万向钱潮erp项目实施可行性分析报告49333字投稿:石墆墇
和家庭,这彻底打碎了长期以来人们习以为常的传统商业运作模式,取而代之的将是 “电子商务 ”运作模式。 企业要么实现 “电子商务 ”,要么就 “无商可务 ”( “EBusiness”or “Out of Business”)。 其次,顾客需求瞬息万变、技术创新不断加速、产品生命周期不断缩短、市场竞争空间日益加大、竞争激烈程度日益加剧,这些构成了影响现代企业生存与发展的三股力量:顾客(
lng汽车改装基地项目可行性研究报告
系列评价指标为结果,它通常处理两方面的问题:一是确定项目在技术上能否实施,二是如何才能 取得最佳效益。 二、 可行性研究报告的用途 项目可行性研究报告是项目实施主体为了实施某项经济活动需要委托专业研究机构编撰的重要文件,其主要体现在如下几个方面作用: 本文档下载后可以编辑 修改,在网上可以免费浏览,谢谢大家的支持。