doc-给排水专业毕业设计外文文献翻译-给排水内容摘要:
ng. For example, if the sprinkler system fails the occupants will be protected with passive protection and smoke control systems. The following sections discuss the three building height limits with respect to the fire safety measures that have been remended. The staged evacuation strategy has not been discussed separately as it is a bination of the other two strategies and the same fundamental principles apply. Buildings greater than 25m in height. Once buildings exceed 25m in height, the ability of the fire brigade to rescue occupants externally bees limited. Therefore, a higher level of fire safety needs to be provided to the stairs and escape paths. Emergency lifts are also considered an option to provide rapid access for the fire brigade and egress for disabled occupants. As buildings bee taller the level of fire protection needs to increase. This is due to: ??Further travel distances, resulting in a higher chance of exposure to fire and fire products, and longer exposure time. ??The reduced ability of the fire brigade to rescue people externally ??The increased time for the fire brigade to reach upper levels ??More occupants, resulting in a higher risk of injury and deaths ??There is a greater variability in occupant abilities and human behaviour, due to the greater number of occupants ??There are more sources of ignition and fireEvacuation in buildings greater than 25m An evacuation strategy relies on the protection of egress paths, as well as the protection of occupants in their apartments before evacuation. The protection of egress paths is critical to ensure occupants are not evacuating through untenable conditions. In buildings greater than 25m high, egress distances can be consider able and therefore, the time occupants spend in escape paths can be significant. In a sprinkler protected building, protection is provided by: 1. The sprinkler system. The sprinklers will activate and extinguish or control the fire, reducing the threat to occupants. 2. Compartmentation and mechanical systems. Rooms, corridors and stair shafts are remended to have a FRR of at least 30 minutes. This will contain the fire in the room of origin and protect occupants before and during egress. Selfclosers provided on doors are to ensure the fire does not spread to the corridor. The stairs are to be pressurised to limit smoke spread, provide a partial safe egress paths and provide a smoke free area for the fire brigade. 3. The final level of protection is the fire brigade. The fire brigade’s role would be to assist any remaining occupants and extinguish the fire. A connection n to the fire brigade will be provided to achieve a faster response. In a nonsprinkler protected building the systems of protection are 2 and 3, as listed above,however the following other fire safety measures will be introduced to increase the level of protection: 1. An increased FRR to 60 minutes minimum. This is to provide additional time for occupant evacuation and fire brigade intervention. If occupants choose to stay in their apartments the i。doc-给排水专业毕业设计外文文献翻译-给排水
相关推荐
内文件一般文字在前,图样在后;译文在前,原文在后;正件在前,附件在后;印件在前,定 (草 )稿在后. 7. 4 案卷编目 7. 4. 1 卷内文件页号的编写 卷内文件有书写内容的页面均应编写页号;页号编写位置:单面书写文件在右下角;双 面书写文件,正面在右下角,背面在左下角;图样的页号编写在右下角,或标题栏外右上方; 成套图样或印刷成册文件,不必重新编写页号:各卷之间不连续编页号. 7. 4.
name),CD..)==0) strcpy(ltrim(rtrim(dirname)),)。 else printf(\nError.\39。 %s\39。 does not exist.\n,dname)。 } void CreateF() /*Create File*/ {int fpaddrno,flag=1,i。 char fname[MAXNAME],str[50],str1[50]
设项目建筑面积 500m2;道孚县妇幼保健 院建设项目总面积 201Xm2;道孚县文化馆建设项目业务用房总 建筑面积 201Xm2;道孚县图书馆建设项 目业务用房总建筑面积 201Xm2;道孚县 唐卡绘画产业发展及艺 术传习中心工程建筑面 积 600m;道孚县电 视台演播综合楼建设项 目建筑面积1500m;道孚县全民健身活动 中心建设项目及配套体
公通字 )〔 2020〕 46号文 的出台,无机保温材料市场火爆。 玻化微珠砂浆原料供不应求,原料价格甚至翻了 一倍之多。 但是保温效果并不良好。 随后出来的产品有 泡沫玻璃、泡沫铝、泡沫陶瓷,岩棉矿棉等纤维保温材料虽然防火性能可达到要求,但综合考虑价格,施工可操作性,环保节能等因素,都无法成为保温材料市场主流产品。 新型建筑保温材料研究与开发,已引起国家相关部门的重视。
目标顾客: 对 3C 产品感兴趣;追求个性、时尚的中高收入家庭成员或个体消费者,这部分消费群体年轻、时尚、追求个性、喜欢独树一帜、愿意支付更高的体验成本,青睐只有自己拥有的特色商品。 *市场定位 由于资金和实力的限制,本企业的市场定位采用避 强定位策略。 避免与强有力的竞争对手发生直接竞争,而将自己的产品定位于另一 细分 市场的区域内, 即个性手机壳定制。 个性定制手机壳 产品与 量产型生产企业
一份满足招标文件要求的标书。 一般来说,联营集团的成员在这个阶段会就费用分担、各成员在项目中应起的作用及项目结构达成初步协 定。 此后,联营集团将进行更具体的项目可行性研究,这对筹资决定的作出和引资能力的增强是一个至关重要的因素。 然后,联营集团将争取潜在的贷款人、股本投资者及承包商和供应商初步表示兴趣,并作出临时性的贷款承诺或提出合同价格,以便在此基础上编出投标书。 回购协议应当包括以下内容