工程类专业毕业设计外文翻译--浅谈房屋建筑施工中的质量管理内容摘要:
ogy to undertake the key is checked, the two is to strengthen the operation of the management, project quality is good or bad, depends to some extent on the construction of personnel operation level. increase onsite inspections Quality management in the construction site should strive to grasp firsthand information, and strive to achieve the timely control, for the occurrence of the problem must acplish early discovery, early correction of bad old practices die hard, avoid, avoid large loss. For example, in the masonry tie bar examination, if taken after the pletion of a masonry opening examination, is not easy to check, and to identify the 4 problems are also difficult to remedy, but in the onsite inspection in a timely manner to solve, can avoid bigger loss, but also easy to get the cooperation. The entity quality inspection methods should adopt scientific monitoring instruments and equipment, to provide accurate, reliable and convincing data, strengthen the government engineering quality supervision and inspection of scientific and authoritative. Through the supervision, to ensure the implementation of mandatory standards, ensure the construction of law, regulations and standard carry out, from macroscopical overall grasp the construction project quality and structure safety. In addition, in strengthening program management at the same time, we must strengthen the technical control. Technology control method using standard evaluation method is better. Evaluation of standard methods are mainly as follows: one is the on site quality assurance condition examination and evaluation, two is the pletion of the project the detection results of the examination and evaluation, three is on site quality assurance data examination and evaluation, four of engineering entity size deviation of the measured, five is for the pletion of engineering the macro visual inspection evaluation. after the pletion of the management After the pletion of the quality management of construction projects is put into use check management. First of all to ensure that do not meet the quality standards of the project can not be put into use, avoid inferior project to the state and public users cause direct harm and influence. The second is the decoration, repair and maintenance of quality supervision in construction project whole life quality management category : one is to eliminate or reduce due to renovation, maintenance process caused by irregularities on the construction engineering foundation, body structure and environmental quality, damage, cause quality accident. Two is prevented due to repair, maintenance quality is not up to the requirements to the state and public users production and living environment caused by direct damage. At this stage of the supervision should be emphasized good two close: it is strictly for its pletion and acceptance review, supervision, to ensure that the registration of the reliability, authority and effectiveness. Two is to enhance the decoration, maintenance of quality management in the process, so that construction project whole life quality objectives are effective implementation, for users to create a safe, fortable, healthy production, living environment, so that the construction quality and realizing the sustainable development. Advocating and implementing project quality。工程类专业毕业设计外文翻译--浅谈房屋建筑施工中的质量管理
相关推荐
出现违约需要索赔时,按索赔程序执行。 (八 )复核工程付款帐单,签发付款证书。 (九 )在施工过程中进行投资跟踪控制,按合同约定定期或不定期进行投资实际支出值与计划目 标值的比较;发现偏差,及时采取纠偏措施。 (十 )对设计变更进行技术经济比较,严格控制设计变更。 (十一 )做好工程施工记录,保存好各种文件图纸,尤其是设计变更的有关图纸处理好索赔事宜。 (十二 )参与合同编制工作
合同作为双方当事人履行权利和义务,相互索赔的依据,在房地产项目实施过程中,认真编制招标文件比签订工程合同尤为重要。 房 地产商必须对以下有关合同问题进行策划和决策: 4. 1 招标方式的确定。 招标方式有公开招标、邀请招标、议标等,各种招标方式有其特点及适用范围,一般要根据承包形式、合同类型、工程紧迫 程度和业主期望控制工程建设和程度等决定;一般采用公开招标。 实践中,房地产商选择以往信誉
rs share uncertainty about many important design changes that occur after the contract is signed and production begins. These changes are usually a consequence of design failures, unanticipated
quantity and below cost on tasks expected to underrun. By skewing, a bidder earns a higher prot without a ecting its total bidand hence probability of winning the contract. Bid skewing is risky. If
部工程进行全面检查、发现问题及时处理,清除隐患,并做好装饰前材料、机具及技术准备工作。 根据预算所需材料数量,提出材料进场日期,在不影响施工用料的原则下,尽量减少施工用地,按照供料计划分期分批组织材料进场。 将墙面找方垂直线,清理基层,然后冲筋,按照图纸要求,分层找平垂直,阴阳角度方正,然后拉线作灰饼。 底子 11 灰应粘结牢固,并用刮杠刮平,木抹子抹平。 罩面应均匀一致,并应在终凝前刮平压光