固定管板式换热器专业译文内容摘要:
shell can not, mechanical cleaning。 The pipe corrosion, together with the shell scrap, the service life of the equipment is low。 In 3, the mechanical design of fixed tube sheet heat exchanger Fixed tube sheet heat exchanger design except for the most critical heat exchanger plate outside, still have two sides, we called the frame plate and the pressure plate frame plate, lateral not movable wall plate, pressure plate heat exchanger plate on the other side of the tie rod bolt to adjust the position of the wall panels can be used。 a plurality of tie rod bolt, used to intensify the frame plate and the pressure plate。 column。 the upper and lower guide rod, connection on the frame plate and between the uprights, used to support and to the pressure plate and the heat transfer piece guide。 the frame plate and the upright post can be installed on the bottom of the soles of their feet, used for fastening machine. In addition, can also have a flange, filter, a thermometer and a pressure gauge and a series of accessories. Heat exchanger classification In two, dividing wall type heat exchanger type Jacket type heat exchanger of the exchanger is arranged in the outer wall of the container jacket made of simple structure。 however, the heating surface by the container wall, heat transfer coefficient is not high. In order to improve the heat transfer coefficient and the kettle liquid is heated evenly, the kettle stirrer. When the jacket cooling water is injected into or no phase change heating agent, also in the clamping sleeve arranged helical baffles or other additional turbulent measures, in order to improve the jacket side heat transfer coefficient heat transfer surface. As a plement deficiency, also can be in the interior of the autoclave fitted snake tube. A clamping sleeve type heat exchanger used in the reaction process of heating and cooling. Submerged coil heat exchanger in this heat exchanger is the metal pipe winding into various and container which is adapted to the shape, and immersed in a liquid contained within the container. The snake tube heat exchanger has the advantages of simple structure, can bear high pressure, corrosionresistant materials available。 the disadvantage is that the liquid in the container turbulent degree low, outer tube heat transfer coefficient is small. To enhance the heat transfer coefficient, the inner container may be mounted stirrer. Spray type heat exchanger this heat exchanger is the heat exchange tube rows over the steel frame, the hot fluid flows in tube, the cooling water from the top shower shower uniformly, so called spray type cooler. Spray type heat exchanger tube is a layer of turbulent degree higher liquid membrane, outer tube heat transfer coefficient more immersive increases a lot. In addition, the heat exchanger is placed in the air flow, cooling water evaporation also take part of heat, can rise to reduce the temperature of cooling water, thereby increasing the heat transfer impetus role. Therefore, and immersion, spray type heat exchanger of heat transfer effect is greatly improved. Sleeve type heat exchanger tube type heat exchanger is posed of different diameter tubes made of concentric sleeves, and by U shaped elbow connected. In this heat exchanger, a fluid inside the tube, another kind of fluid go ring gap, both can get a higher flow rate, the heat transfer coefficient. In addition, in the casing heat exchanger, two kinds of fluid for pure countercurrent, logarithmic mean driving force of the larger. Casing heat exchanger has the advantages of simple structure, can withstand the high pressure, the application is convenient ( may need to increase or decrease the number of tube sections ). Especially due to casing heat exchanger at the same time with a large heat transfer coefficient, heat transfer of large driving force and can bear high pressure and strong advantages, in the super high pressure process (such as operating pressure of 3000 high pressure polyethylene production process ) used in the heat exchanger is almost entirely sleeve type. Plate heat exchanger is the most typical shellandtube heat exchangers, its application in the industry has a long history, and is still in the dominant position in all heat exchanger. The main structure prises a heat exchanger plate and plate between the adhesive tape. In the longterm market dominant position, but the large volume, low heat exchange efficiency, to replace the rubber strip is expensive ( tape replacement costs about the process of 1 / 31 / 2 ). Mainly used in liquid liquid heat transfer between the industry, often referred to as water water heat exchanger, the heat transfer efficiency of 5000W / . In order to improve the pipe and fluid heat transfer coefficient, usually installed in a shell body of a certain number of transverse baffle plate. Baffle plate not only can prevent the short circuit flow, increasing the fluid velocity, forcing the fluid in accordance with the provisions of the path many times wrong flow through the tube bundle, which gr。固定管板式换热器专业译文
相关推荐
: 详见图纸t 34 010606002020 钢檩条钢材品种 、规格: 详见图纸(螺栓综合考虑)油漆品种、刷漆遍数: 详见图纸t 35 010606012020 零星钢构件钢材品种、规格: 详见图纸(螺栓综合考虑)油漆品种、刷漆遍数: 详见图纸t 36 010606008001 钢梯 粮仓检查梯钢材品种 、规格: 详见图纸油漆品种、刷漆遍数: 详见图纸部 37 010606009001
在 vCenter 上管理负载均衡设备,自动同步配置。 提供 功能 配置截图、产品功能介绍或相关功能证明文件 支持与 VMware vCenter 联动,可根据业务高峰期与空闲时段进行主动判断,针对应用系统的虚拟机负荷(例如服务发连接数、 CPU 阈值等信息)进行实时调整,通过动态增加或关闭虚拟机以调整业务资源。 无需额外购买 VMware Lisence 第 14 页共 45 页 入侵检测系统
年 月 日 5 十五、项目组织单位意见 1.对专家组或中介机构评审(评估)结果的意见; 2.对是否选择课题申报单位为课题承担单位的意见; 3.其他说明。 项目组织单位负责人(签章) 年 月 日 6 四、课题预算书格式 国家科技计划课题预算 申报书 计划名称: 项目编号: 项目名称: 课题编号: 课题名称: 课题承担单位(公章): 课题承担单位法定代表人(签字): 课题 负责人(签字):
次分明,主要道路导环状布置,局部环状相通,在番国大道设主要出入口,古城路和将军路上分别开设了次要出入口,同时在医院北侧设置了 辅助出入口和总污物出口,做到了科学地组织人流和物流,避免或减少交叉感染。 以人为本,特色体现 本项目建设贯彻“以人为本”的设计思想,重视医院内外环境设计,体现资源共享的合理布局,提高使用效率,为病人创造一个舒适、温馨的门急诊、医技、住院环境,为医护人员提供一个优质的
它既可与间苯二酚甲醛树脂并用构成 RFS 粘合体系,增加镀铜钢丝与橡胶的粘合;也可有机钴盐并用构成沉淀白炭黑/钴和沉淀白炭黑/树脂/钴粘合体系。 这两个粘合 体系在热、湿气和盐水老化前后的粘合力均随沉淀白炭黑用量的增加而呈线性增加。 用高分散性、比表面积小的沉淀法白炭黑补强的溴化丁基胶气密层,其耐透气性、耐疲劳性、低生热性、 300%定伸应力、扯断伸长率和拉伸强度
24 第七章 项目环境保护分析 选择一批铸、锻、焊、热处理等行业的龙头企业实施“绿色基础制造工艺技术与装备应用示范”装针对基础工艺关键工序开展生产工艺绿色化改造,重点推广绿色、先进的铸造、锻压、焊接、切削、热处理、表面处理等基础制造工艺技术与装备。 建立绿 色化数字化车间 /工厂,建立数字化、柔性化、绿色、高效的铸造车间,以锻压设备为中心构建数字化冲压车间,建设数字化焊接车间、数字化热处理车间