历下区科技发展计划项目可行性研究报告项目名称:靶向介入局部缓释新内容摘要:
relationship between rates of drug release from polymer implants and drug concentration in brain tissue is unknown. This work presents a pharmacokiic framework for application of this new modality of chemotherapy delivery in primates. Either [3H]carmustine, 4hydroperoxycyclophosphamide (4HC), or paclitaxel was encapsulated in a polyanhydride pellet (2841 micro Ci/animal, 40 mg/animal), which was implanted intracranially in cynomolgus monkeys (Macaca fascicularis)。 (n = 17) for up to 30 days. Drug concentrations in the brain, blood, and cerebrospinal fluid were measured by quantitative autoradiography, TLC, and scintillation counting. High drug concentrations ( mM for carmustine, mM for 4HC, and mM for paclitaxel) were measured within the first 3 mm from the polymer implant。 significant ( microM for carmustine, 3 microM for 4HC, and microM for paclitaxel) concentrations were measured up to approximately 5 cm from the implant as long as 30 days after implantation. Pharmacokiic analysis indicated that tissue exposure to carmustine area under concentrationtime curve achieved by polymeric delivery was 41200 times higher than that produced by . administration of a higher dose. 15 Optimizing interstitial delivery of BCNU from controlled release polymers for the treatment of brain tumors. Eric P. Sipos, Betty Tyler, Peter C. Burger, H. Brem, et al Cancer Chemotherapy and Pharmacology Vol 39, Number 5 / Feb, 1997 Two approaches for improving the interstitial administration of carmustine (BCNU) using % loaded poly(carboxyphenoxypropanesebacic acid), an implantable biodegradable anhydride which significantly prolongs survival in patients with recurrent malignant gliomas, were evaluated. First, increasing the ratio of carboxyphenoxypropane (CPP) to sebacic acid (SA) in the polymer increases its hydrolytic stability, thus prolonging its halflife in vivo, and extending the period of drug release. A second approach is to increase the dose of drug loaded into the polymer. This study evaluated the relative merits of these two approaches by paring release kiics, safety, and efficacy of escalating BCNU doses in polymers with 20:80 and 50:50 ratios of CPP to SA. At the highest dose tested, the 50:50 polymer released BCNU times as long in vitro as the 20:80 polymer. Both formulations were nontoxic in rat brains for all BCNU doses tested except 32%. The 20:80 and 50:50 polymers were equally effective in the rat intracranial 9Lglioma model. A doseresponse relationship for BCNU was observed (hazard ratio for each mg/kg increase, P). The two highest loading doses of BCNU improved survival 40fold (P). The 20% BCNUloaded 20:80 polymer achieved the best balance of toxicity and antitumor efficacy, yielding a 75% longterm survival rate. Further evaluation of this polymer in monkeys suggests that it might be used with acceptable toxicity. This study establishes that a doseescalation strategy for improving BCNU controlledrelease polymers is more effective than adjusting the ratio of CPP to SA to prolong drug release. 16 Biodegradable polymer implants to treat brain tumors. Brem H, Gabikian P. J Control Release. 2020 Jul 6。 74(13):637. We have developed a systematic approach for the discovery and evaluation of local treatment strategies for brain tumors using polymers. We demonstrated the feasibility of polymermediated drug delivery by using the standard chemotherapeutic agent 1,3bis(2chloroethyl)1nitrosourea (BCNU) and showed that local treatment of gliomas by this method is effective in animal models of intracranial tumors. This led to clinical trials for glioma patients, and subsequent approval of Gliadel [(% BCNU): p(CPP:SA)] by the FDA and other worldwide regulatory agencies. Twentytwo additional clinical trials are currently underway evaluating other issues related to the BCNU polymer, such as dosage, bination with systemic treatments, and bination with various forms of radiation and resistance modifiers. These trials are a result of laboratory investigations using brain tumor models。 based on these models, other research groups have initiated clinical trials with novel binations of different drugs and new polymers for both intracranial tumors (5fluorouracil delivered via poly(DL lactidecoglycolide) polymer) and for tumors outside the brain (paclitaxel in PPE microspheres for ovarian cancer). Since only 1/3 of patients with glioblastoma multiforme (GBM) are sensitive to BCNU, the need to search for additional drugs continues. Although we are attacking major resistance mechanisms, there still will be tumors that do not respond to BCNU therapy but are sensitive to agents with different mechanisms of action, such as taxanes, camptothecin, platinum drugs, and antiangiogenic agents. Thus, it is necessary to explore multiple single agents and ultimately to bine the most effective agents for the clinical treatment of GBM. Furthermore, multimodal approaches bining radiotherapy with microsphere delivery of cytokines and antiangiogenic agents have demonstrated encouraging results. 17 6 、 Chemotherapeutic Drugs Released from Polymers: Distribution of 1,3bis(2chloroethyl)lnitrosourea in the Rat Brain Lawrence K. Fung, Marian Shin, Henry Brem and W. Mark Saltzman,et al. Journal Pharmaceutical Research. 1996 13(5): 671682 Abstract Purpose. The distribution of [3H]BCNU following release from polymer implants in the rat brain was measured and evaluated by using mathematical models. Methods. [3H]BCNU was loaded into p(CPP:SA) pellets, which were subsequently implanted intracerebrally in rats。 [3H]BCNU was also directly injected into the brains of normal rats and rats with intracranially transplanted 9L gliomas. Concentrations of [3H]BCNU on coronal sections of the brain were measured by autoradiography and i。历下区科技发展计划项目可行性研究报告项目名称:靶向介入局部缓释新
相关推荐
情再也没有低过 23 杨双远 yangshuangyuan@xm 13306049897 42 图像数字水印算法实现 主要内容: 图像 数字水印技术是目前版权保护的重点课题,主要涉及到图像变化、图像内容或图像特征子空间提取以及信号容量模型、水印 嵌入、提取、篡改定位等多项内容。 开发工具和环境: , windows, java/C 目标: 设计一个水印算法, 用 matlab仿真实现,最后用
p。 qYp@Eh5pDx2zVkumamp。 gTXRm 6X4NGpP$vSTTamp。 ksv*3tnGK8! z89Am YWv*3t nGK8!z89Am YWpazadNuKNamp。 MuWFA5uxY7JnD6YWRrWwc^vR9CpbK! zn% Mz849Gx^Gjqv^$U*3t nGK8! z89Am YWpazadNuKNamp。 MuWFA5uxY7JnD6YWRr
步加快我们的算法,并用 C代码实现 ( 3) 进一步优化我们的多重集算法并用汇编语言实现 3. 目的 培养 科研或编程的能力 ,为毕业后的工作打下一定的基础。 06 团队合作 ,分工协作 .要求每人确有如下特长 之一 : 算法科研能力强 C编程高手 汇编语言编程高手 英文很好 如想要当面询问我的请直接到我办公室或将你的电话号码 EMAIL给我,我将和你约个时间。 Ray
建一座污水处理厂。 项目位于卤阳湖现代综合产业开发区东片区,污水统一收集排至东区污水处理厂。 建筑材料供应条件 本项目建设所需的水泥、沙子、碎石、钢材等建筑材料,在项目地和西安附近供应充足,项目实施单位可通过货比三家,择优选购,从市场采购解决。 交通、通讯条件 渭南卤阳湖现代产业综合开发区西区北 距蒲城 8km,西距阎良20km,西北距富平 30km,南距渭南中心城市 35km,距西安 78km
验收要求 ( 1)采购人对扫描质量进行平时考核和各期款项支付前 抽查(按完成总量 20%数量进行检查),若有漏扫、错扫、扫描质量明显粗糙模糊 与原图差别很大且非扫描仪等客观原因造成的 , 中 标人须予以改正;若有著录错误的, 中 标人须予以改正;如最后工程进度无法在预定期内完成,则每拖延一个工作日,扣发服务费 1000 元,连同最后一期服务费结算。 ( 2)采购人对档案装订质量的检查分为
委政府,为促进城乡统筹发展,全面推进森林城市建设和社会主义新农村建设的重大项目。 大西南国际经济文化传播有限公司(以下简称本公司)受 渝北区木耳镇党委政府的委托, 承担了本项目开发建设策划 研究 与概念性规划设计的任务。 为此,我们专门组建了由本公司策划专家及外聘专家组成的本项目开发建设策划与规 划专案小组,并以策划规划专案小组为主体进行了大量调研工作, 收集