单片机原理毕业论文外文翻译内容摘要:
equired by the instruction in question. Therefore, if you have a system which is using an clock, you can pute the number of instructions per second by dividing this value by 12. This gives an instruction frequency of 921583 instructions per second. Inverting this will provide the amount of time taken by each instruction cycle ( microseconds). 3. The SCM development trend Now can say single chip microputer as the period of the flowers, the world each big panies have launched their own SCM chip making, from 8bit, 16bit to 32bit, endless, of everything, they are all so different, mutual plement each other, for the application of single chip microputer to provide broad heaven and earth. Throughout the SCM development process, can predict SCM development trend. (1) low power consumption CMOS MCS 51 series of 8031 launched when the power of 630 mw, and now the single chip microputer generally around 100 mw, with singlechip puter power consumption requirements more and more low, now various microcontroller manufacturers generally adopted CMOS (plementary metal oxide semiconductor process). 80C51 is adopted HMOS (., high density metal oxide semiconductor) and CHMOS(plementary highdensity metal oxide semiconductor) process. CMOS low power consumption, but due to its physical characteristics determine its working speed is high enough, while CHMOS has high speed and low power consumption characteristics, these characteristics, more suitable for the low power consumption, battery powered applications. So this process will be a period microcontroller development the main way in the future. (2) miniature single chip Now the conventional SCM is generally is the central processor (CPU), random access data memory (RAM), readonly memory (ROM), parallel and serial munication interface, interrupt system, timer circuit, clock circuit integrated on A single chip, enhanced SCM integrates such as A/D converter, PMW (pulse width modulation circuit), WDT (watchdog), some single chip LCD driver circuit are integrated on A single chip, which microcontroller contains unit circuit is more, the more powerful. Even single chip manufacturers can also be customized according to user39。 s requirements, create with their characteristics of singlechip microputer. In addition, now product is generally require small size, light weight, which requires the microcontroller in addition to the strong function and low power consumption. (3) mainstream coexist with many varieties Now although microcontroller variety, each has its own characteristics, but still with 80 c51 as the core of the singlechip puter were dom。单片机原理毕业论文外文翻译
相关推荐
将上述诸式代入 包 络条件式( 14),可得位置参数与曲线参数的关系为 iAk /)(a rc c os 121 ( 28) 联立( 27)和( 28)可得到 GH 的方程,可发现 GH 的性质是一摆线。 ③ 啮合线方程 AB 和 GH 啮合时的啮合线方程,可按式( 21),通过把 AB 的方程( 22)代入坐标变换式( 3),并与包络条件式( 28)联立得到,即
其中要有一篇外文资料, 翻译 万印刷字符(或译出 3000 汉字)以上的有关技术资料或专业文献,内容要尽量结合课题(译文连同原文单独装订成册)。 ( 5)结论 结论一般包括研究成果、建议和建议被采纳的可能性。 ( 6)参考文献 参考文献应列出撰写论文时参考了哪些主要书刊、资料。 包括书刊名称、作者、出版单位及时间等。 一般做毕业设计 (论文 )的参考文献不宜过多,但应列入主要的文献可 10
如投标方代表不是法人代表,须持有《法人代表授权书》原件。 投标方应 具有软件及 OA系统研发的 专业资质 ,并 在近年内 具有一定的项目成功开发 和实施 案例和 经验。 投标时间 所有投标文件应于 2020年 5月 15日 17时(北京时间)前递交给招标小组,逾期或不符合规定的投标文件恕不接受。 招标方推迟投标截止时间时,应以书面(或传真、电子邮件)的形式,通知所有投标方。 在这种情况下
告等邮件。 支付和配送功能 : 支持几十种支付方式,如支付宝、 Paypal 等 , 支持多种配送方式、配送地区 模板功能 : 一键变换模板,让网店表现形式丰富多彩,独具个性 , 内置功能强大的模板编辑器 , 可自行上传、应用新的模板 , 灵活的标签机制,可将任何内容设置为标签(商品、文章或任何自定义的文字、图片等) 文章功能 : 无限文章分类 , 可通过模板标签的方式在前台引用任何文章