模块三第二课时内容摘要:

. •This stamp has got a picture of pandas on it. •This stamp has got a picture of the Great Wall on it. •This one has got a picture of a dragon on it. •This one has got a picture of a tiger on it. •This stamp has got a picture of a horse on it. • This one__________ a picture of __________on it. has got have got 和 has got 的用法区别: have got 用于除第三人。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。