20xx春牛津深圳版英语八下unit7theunknownworld7内容摘要:
nother alien appeared from the bushes in front of them. It discovered them and made a terrible noise! The children ran away in fear. / 39。 fraɪtnd / /dɪ39。 skʌvə(r)/ /fɪR(r)/ /‘terRbl/ The next morning, Tina and Tom told their parents about the strange creatures. “They were very ugly. They had some hair, but they didn’t have any feathers,” said Tina. “There was something written on the spaceship,” said Tom. “It looked like this. I wonder what it means.” He drew some lines on a piece of paper. But Dad said, “Since no one else saw these aliens, I refuse to believe you. Now go to school!” /39。 fe240。 ə(r)/ /39。 wʌndə(r)/ /laɪn/ /rI3fjuːz/ The children spread their wings and flew to school together. Dad looked at the piece of paper with the strange marks on it. “It looks strange,” he said,。20xx春牛津深圳版英语八下unit7theunknownworld7
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。