20xx春牛津上海版英语九下unit4allaboutfilmsandtv1内容摘要:

ticle says‘_________________________________________________________________________________.’ • 3 Did Julia feel excited when a big dinosaur model roared at them? • _________. Because she said, ‘________________________________________________________’ No Julia said that she liked Dinosaur Jungle most, although Roddy was less keen on it No I almost jumped out of my skin when the dinosaur roared at us 4 Did Julia and Roddy both like the Great Wave attraction? _________. Because the article says ‘ ___________________________________________________________________________.’ Yes Julia and Roddy were both impressed by the Great Wave attraction. 5 Did Julia envy Roddy when the directior selected him to be in the film? _________. Because she said that__________________________________________________________. Yes She felt green with envy because her ambition was to be an actress 6 Did Roddy think it was hard to act the par。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。