20xx-20xx学年度山东省滕州市七年级英语上册期末复习综合练习题一人教新目标版内容摘要:

lunch C. dinner D. vegetable 30. A. on B. in C. from D. at 三、阅读单选 A heavy drinker with a clever boy was drinking in a room. After a few bottle of wine , he was drunk. The clever boy asked him to have another drink . No , no... the drinker said. I drank too much wine. I see everything in my eyes in double images . Hearing these words , the boy took a 10 yuan note from his coat and gave it to the drinker . I borrowed 20 yuan from you yesterday . Here is the money, said the boy. Please give me the IOU (借条 ). Then the drinker took out the IOU from his coat and said, Yours , Yours are two pieces of IOU. And give me another 20 yuan . 问题 31. 32. The man was drunk because_____. A. he worked too hard B. the boy was clever C. he drank too much D. the room was too hot 33. 34. The boy borrowed ____ from the man . A. 20yuan B. 40yuan C. 10yuan D. 30yuan 35. 36. Why did the boy want to return the money at that time。 A. He thought the man was drunk. B. He had the money in his coat. C. The drinker asked him to do. D. He promised to do so. 37. 38. The drinker said there were two pieces of IOU because ____. A. the boy really wrote two pieces of IOU. B. he wrote the other one C. the boy borrowed the money twice D. he saw things in double images 39. 40. The drinker asked the boy to___ A. help him with milk B. give him another twenty yuan note C. take him home D. pay the bill I’ m Mike. This is my room. A bed, a desk, a chair, a sofa and a TV (电视机 ) are in my room. A green quilt is on the bed。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。