20xx牛津译林版七年级下册unit3welcometosunshinetownrevision课件内容摘要:

beautiful and quiet, but it _____(rain) a lot. (not give) me any answer until I tell them the secret. _____ we ______(plant) trees tomorrow? will call rains won’t give shall plant across The little horse is walking _______ the river. along The cows are walking ______ the river. The woman is jumping _____ the stick. over The dog is walking______ the stairs. down The train is going _______ the tunnel. through 中考链接 1. On sunny winter mornings, the sun shines ______the window and makes the room warm. A. across B. into C. through D. out 2. After ing into the building, he walked _____ the lift and went ______to the tenth floor. A. towards。 up B. into。 up C. to。 down D. into。 / C B Ask the way Could you tell me how to get to Dieshiqiao, please? Could you tell me the way to Dieshiqiao, please? Excuse me, how can I get to Dieshiqiao? Excuse me, where is Dieshiqiao? Excuse me, is Dieshiqiao near here? Di。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。