20xx上海教育版英语六年级下册期中测试题阅读理解内容摘要:

. But he didn’t know that his joke was the same as the first one. ( ) 1. When was Jack deaf of both ears? A. After he came back from work. B. after a serious illness. C. After seeing a doctor. ( ) 2. Why did Jack not like people to know he was deaf? A. He was afraid of his friends. B. He was afraid to lose his work. C. He was afraid his wife would leave him ( ) 3. Jack’s friends laughed a lot louder than before because________. A. his joke was more interesting B. it was as interesting as the first C. it was the same joke as his friend’s B Nora is 16 years old. She has a little brother. Her brother’s name is Jim. Jim is seven years younger (年轻 ) than Nora. Jim is sometimes naughty(淘气 ), but makes Nora laugh a lot, and she loves him and is always very nice to him. One afternoon she is walking from her house to the shop when she sees a small boy running along the street. He is going very fast. When he es near her, she is surprised to see it is Jim . “ Hi, Ji。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。