空调公司1201检验和试验状态控制程序(编辑修改稿)内容摘要:

in “Acceptable Products Requisition” and prepare “Acceptable” labels immediately after the raw materials and outsourcing parts have passed the inspection and test. At receipt of the “Acceptable Products Requisition” the storekeeper shall conduct the ining procedure. b) 半成品经检验和试验合格后,在《作业流程卡》上签署检验印章,并将产品分区存放。 After semifinished products passed the inspection and test, Operation Flow Card should be chopped. They shall be stored by zone, c) 经检验和试验合格的成品,由质量部检验员签发 《 合格通知单 》 交库 房保管,由仓库保管员按指定区域存放,作好相关标识,并作记录。 The finished products that have passed the inspection and test shall be issued with “Acceptable Products Requisition” by the Quality Department and then be stored in finished product warehouse. The storekeeper shall store them at a designated zone and make appropriate labels and records. 不合格状态 Unacceptable Status a) 原材料、协配件经质量部检验和试验为不合格时,由检验员开具 《 不合格品通知单 》 ,并通知有关单位,执行《不合格品控制程序》。 仓库保管员接到通知后立即换上不合格标识,隔离存放。 If the raw materials and accessory parts prove to be unacceptable through inspection and test, the Quality Department shall issue “Unacceptable Parts Requisition”, notify relevant departments and carry on “Nonconforming Product Control Procedures”. At receipt of the notice, the storekeeper shall change to an “Unacceptable” label and store the goods in isolation. 程 序 文 件 Procedure Document 重庆英特空调有限公司 Air International Chongqing Co., Ltd. 文件名称 (Doc Name): 检验和试验状态控制程序 Inspection amp。 Test Status Control Procedures 版次 Ver 页次 Page 发行日期 Release Date 文件编号 (Doc No): AICQ/QP1201 B/0 4 6 20xx0110 b) 车间生产的半成品、成品经检验为不合格后换上不合格标识,并分区隔离存放,按《不合格品控制程序》通知相关部门进行评审处置。 If the semifinished and finished products in the workshop are inspected to be unacceptable, they shall be。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。