空调公司1101检验测量和试验设备控制程序(编辑修改稿)内容摘要:
,作为校准依据的技术文件,如检具等。 When the calibration of the IMTE can39。 t be traced in the national standard, a selfcalibration method will be piled by the Engineering Department as the technical documents for calibration . 经检定的检测设备,由相应的计量部门发给检定证书,并由质量部在检测设备上标以合格、停用、准用、报废等状态标识, 并填写《检测设备履历卡》 The calibrated IMTE shall be issued with Authentication Certificate by corresponding measurement authority. Meanwhile, the Quality Department shall attach status labels onto the IMTE, . acceptable, suspension, admissible, or scrap, and fill in the IMTE Record Card. 程 序 文 件 Procedure Document 重庆英特空调有限公司 Air International Chongqing Co., Ltd. 文件名称 (Doc Name):检验测量和试验设备控制程序 Inspection, Measuring amp。 Test Equipment Control Procedures 版次 Ver 页次 Page 发行日期 Release Date 文件编号 (Doc No): AICQ/QP1101 B/0 4 7 20xx0110 质量部保存检测设备的检定和校准记录,及检测设备的其他档案。 The Quality Department will keep the inspection and calibration records of the IMTE, and other files. 使用和维护 Operation and Maintenance 检测设备使用人员正确使用和维护检测设备,做好日常的维护保养工作,使设备处于完好状态。 All users should operate the IMTE correctly and be responsible for the daily maintenance to make the equipment stay in good order. 发现检测设备偏离校准状态时,应停止使用,并通知质量部对检测过的产品、项目重新评定其有效性,并采取相应的纠正措施,追溯到不合格的产品按《不合格品控制程序》执行。 When the IMTE is found of deviation off the calibration, it should be suspended from using. The Quality Department should be informed to reevaluate the effectiveness of the inspected products and items, and meanwhile conduct corrective actions. To trace the unacceptable product, follow the “Nonconforming Product Control Procedures”. 检测设备的使用环境应满足测量要 求。 The operating environment of the IMTE should meet the measurement requirements. 检测设备的搬运、防护和贮存期间防止冲击、碰撞等损伤应严格按使用说明规定执行,使其准确度和适用性保持完好,使用前检查其校准状态是否完好,并防止因调整不当而使其准确度失效。 In handling, preservation and storage process, the IMTE must be prevented from shock and bumps. Follow the operation instructions and ensure the IMTE in good precision and applicability. Before use, check the calibration status of the IMTE and prevent precision failure due to improper adjustment. 准用和报废 Admission and Scrap 检测设备经维修后达不到合格标准,但仍能满足测量要求,经管理者代表同意后可准用,达不到测量要求时,作报废处理。 If the IMTE, after being repaired, cannot reach the st。空调公司1101检验测量和试验设备控制程序(编辑修改稿)
相关推荐
in “Acceptable Products Requisition” and prepare “Acceptable” labels immediately after the raw materials and outsourcing parts have passed the inspection and test. At receipt of the “Acceptable
f Quality Records”, identifying the name, number, retention period and retention department of each quality record. 使用表格部门每月应进行一次核查,确定一览表内容与实际相符。 各职能部门负责管辖范围专业性质量记录的收集、整理,质量部负责每月综合检查质量记录的编号及归档情况。 The
Document 重庆英特空调有限公司 Air International Chongqing Co., Ltd. 文件名称 (Doc Name):内部质量审核控制程序 Internal Quality Audit Control Procedures 版次 Ver 页次 Page 发行日期 Release Date 文件编号 (Doc No): AICQ/QP1701 B/0 4 8
case the methods other than the standards are adopted. 所有试验规程、操作规程以及所需技术规范等均须在测试现场易于得到,供试验人员使用。 程 序 文 件 Procedure Document 重庆英特空调有限公司 Air International Chongqing Co., Ltd. 文件名称 (Doc Name): 实验室质量手 册
行检验的产品,质量部通知制造部进行小批量试装或加工,并作好标识和记录。 原材料可依据随货质量证明文件进行判断。 For the products beyond AICQ inspection capabilities, the Quality Department shall inform the Manufacturing Department to conduct small batch
operation instructions shall be formulated under the anization of the Equipment Section of Manufacturing Department. The operator shall observe the operation instructions and keep the equipment in