空调公司1002实验室质量手册(编辑修改稿)内容摘要:
case the methods other than the standards are adopted. 所有试验规程、操作规程以及所需技术规范等均须在测试现场易于得到,供试验人员使用。 程 序 文 件 Procedure Document 重庆英特空调有限公司 Air International Chongqing Co., Ltd. 文件名称 (Doc Name): 实验室质量手 册 Laboratory Quality Manual 版次 Ver 页次 Page 发行日期 Release Date 文件编号 (Doc No): AICQ/QP1002 B/0 4 8 20xx0110 All the test procedures, operation regulations and necessary technical specifications must be easily available at the test site. 实验室接到《试验申请单》和试验件后进行登记,在试验件上标识送验日期、委托部门和《试验申请单》 编号或试件批号,并对来样进行编号,放在待验区内,对于有存放条件限制的试件须按规定的存放条件储存,试件应注意防护不得损坏腐蚀。 At receipt of the “Test Request” and the test part, the lab shall make record properly, and label the test part with delivery date, entrustment department and the number of “Test Request” or the lot number of the test part . Meanwhile, niumber tha sample and place it in the AwaitingInspection area. The test part with storage restrictions must be stored in the prescribed way. All test parts must be prevented from damage or corrosion. 根据《试验申请单》的测 试要求进行测试并作好原始记录,测试完成后填写《试验报告》,报告中注明试件批号 /送验单编号,送验日期 /部门,以便报告可追溯原始记录和试件,并将试件放置在已验区域内。 Conduct the test according to the requirements as stated in the “Test Request” and make original records properly. After pleting the test, it is required to write “Test Report”, in which the test part lot No. / delivery No. and delivery date/department shall be indicated, so as to use the Test Report to trace the original records and test part. Meanwhile, place the test part in the area for tested part. 测试试件在测试完毕后可由实验室通知送验部 门取走,如送验部门不来领取则试件由实验室保存 15天以便复检,保存期过后由实验室负责处理,在保存期须对试件进行必要的防护。 After pleting the tests, the lab may inform the delivery department to take back the test part. In case the delivery department does not take the test part back, the lab may retain it for 15 days for reinspection. After the retention period, the lab may dispose the test part, but during retention period, the test part must be properly preserved. 试件经测试不合格则由实验室出具试验报告交送验部门,由送验部门按《不合格品控制程序》程 序 文 件 Procedure Document 重庆英特空调有限公司 Air International Chongqing Co., Ltd. 文件名称 (Doc Name): 实验室质量手 册 Laboratory Quality Manual 版次 Ver 页次 Page 发行日期 Release Date 文件编号 (Doc No): AICQ/QP1002 B/0 5 8 20xx0110 处置。 The lab will issue a test report to the delivery department if the test part fails the test. The delivery department will dispose per the “Nonconforming Product Control Procedures”. 试验报告按《质量记录控制程序》规定保存期保存。 The test report will be retained for a length of time as required in “Quality Record Control Proced。空调公司1002实验室质量手册(编辑修改稿)
相关推荐
,作为校准依据的技术文件,如检具等。 When the calibration of the IMTE can39。 t be traced in the national standard, a selfcalibration method will be piled by the Engineering Department as the technical documents for
in “Acceptable Products Requisition” and prepare “Acceptable” labels immediately after the raw materials and outsourcing parts have passed the inspection and test. At receipt of the “Acceptable
f Quality Records”, identifying the name, number, retention period and retention department of each quality record. 使用表格部门每月应进行一次核查,确定一览表内容与实际相符。 各职能部门负责管辖范围专业性质量记录的收集、整理,质量部负责每月综合检查质量记录的编号及归档情况。 The
行检验的产品,质量部通知制造部进行小批量试装或加工,并作好标识和记录。 原材料可依据随货质量证明文件进行判断。 For the products beyond AICQ inspection capabilities, the Quality Department shall inform the Manufacturing Department to conduct small batch
operation instructions shall be formulated under the anization of the Equipment Section of Manufacturing Department. The operator shall observe the operation instructions and keep the equipment in
customer from the responsibilities for providing acceptable products. 对顾客提供的用于产品的原材料或零部件,抵达公司后由市场销售部办理接收手续、交采购物流部,由采购物流部填写送检单,并附上顾客提供产品的质量文件交质量部。 同时核对产品标识、数量和记录及相关文件归档备查。 At the arrival of customer