空调公司0905设备管理控制程序-设备管理(编辑修改稿)内容摘要:

operation instructions shall be formulated under the anization of the Equipment Section of Manufacturing Department. The operator shall observe the operation instructions and keep the equipment in good maintenance and repair. 程 序 文 件 Procedure Document 重庆英特空调有限公司 Air International Chongqing Co., Ltd. 文件名称 (Doc Name): 设备管理控制程序 Equipment Management Control Procedures 版次 Ver 页次 Page 发行日期 Release Date 文件编号 (Doc No): AICQ/QP0904 B/0 5 10 20xx0110 b. 必须对操作工进行知识和技能的培训,经考核合格持证上岗。 To improve knowledge and skills, the operators must be provided with necessary training. Only those holding qualification certificates are allowed to work on relevant posts. c. 做好年度维修、保养计划,按计划做好维修保养工作。 Work out annual repair and maintenance planning, and carry out the repair and maintenance as scheduled in the planning. d. 必要时对过程参数进行连续监控。 If required, the process parameters should be monitored continuously. 设备保养维修控制 Equipment Repair amp。 Maintenance Control 由制造部设备部门根据设备运行情况、过程控制图反映的工序稳定性,制造商的建议等制订设备保养维修计划,根据保养工作量和难易程度,分为日常保养、一级保养(小修)、二级保养(中修)、三级保养(大修),设 备管理人员负责验收及记录。 The Equipment Section of Manufacturing Department shall formulate Equipment Repair amp。 Maintenance Planning by considering the equipment operation, process stability as revealed in the process control drawing, and the manufacturers’ proposals. According to the workloads and difficulties, the maintenance is classified into four levels, . Routine Maintenance, 1st Level Maintenance (minor repair), 2nd Level Maintenance (medium repair) and 3rd Level Maintenance (major or overhaul repair). 日 常维护保养 Routine Maintenance a. 操作人员每日上班先根据《设备日常点检卡》之要求对设备进行保养,下班前清扫周边环境,擦拭机械设备。 Before starting the job each day, the operators shall carry out proper maintenance as required in “Routine SpotCheck Card”. Before finishing the job, the operators shall clear the space around and wipe the equipment clean. b. 设备日常运作出现故障时,由使用部门开出工作委托单交设备维修人员处理,设备维修人员接程 序 文 件 Procedure Document 重庆英特空调有限公司 Air International Chongqing Co., Ltd. 文件名称 (Doc Name): 设备管理控制程序 Equipment Management Control Procedures 版次 Ver 页次 Page 发行日期 Release Date 文件编号 (Doc No): AICQ/QP0904 B/0 6 10 20xx0110 单后安排维修工进行维修。 维修结束后,使用部门进行验收,验收合格后,针对故障在《设备履历卡》上作记录。 In case the equipment is found to fail during daily operation, the operating department shall issue a Job Bill and submit it to the maintenance personnel. At receipt of the Job Bill, the maintenance personnel shall assign proper repairman to make repairs. After pleting the repair, the operating department shall make an inspection. If the repair proves acceptable, the troubles will be recorded in Equipment History Sheet. 维修保养 Maintenance amp。 Repair a. 设备维修人员每年制定《设备年度检修计划》,报部长批准后执行。 计划检修:一级保养(小修),二级保养(中修)由相关部门填写工作委托单交设备维修人员维修,三级保养(大修)可由 制造部设备科 托外修理。 The equipment maintenance personnel shall formulate Equipment Annual Repair Planning each year and submit it to the Department Manager for approval. Scheduled Repair: Subject to the Job Bill issued by the department concerned, 1st Level Maintenance (Minor Repair) and 2nd Level Maintenance (Medium Repair) can be done by the equipment maintenance personnel. 3rd Level Maintenance (Major Repair) might be outsourced by the Equipment。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。