空调公司0701顾客提供产品的控制程序-产品策略(编辑修改稿)内容摘要:
customer from the responsibilities for providing acceptable products. 对顾客提供的用于产品的原材料或零部件,抵达公司后由市场销售部办理接收手续、交采购物流部,由采购物流部填写送检单,并附上顾客提供产品的质量文件交质量部。 同时核对产品标识、数量和记录及相关文件归档备查。 At the arrival of customer supplied raw materials or parts, the Marketing Department shall clear receipt formalities and submit to the Purchasing Department. The Purchasing Department should fill in the inspection bill, attach the product quality documents and submit them to the Quality Department. Meanwhile, verify the product labeling, quantity and records, and file relevant documents for future reference. 质量部对顾客物资进行检验和必要的核对, 并记录将检验结果反馈给采购物流部。 The Quality Department shall inspect and verify the customer supplied products, keep the inspection records in file and feed back the inspection results to the Purchasing Department. 采购物流部对合格的顾客提供的产品办理入库手续, 交仓库管理。 对不合格品应办理退货手续或按不合格品控制程序办理让步接收申请。 The Marketing Department shall clear admission formalities for acceptable customer supplied products and put them in warehouse. The Marketing Department shall clear 程 序 文 件 Procedure Document 重庆英特空调有限公司 Air International Chongqing Co., Ltd. 文件名称 (Doc Name):顾客提供产品的控制程序Custom。空调公司0701顾客提供产品的控制程序-产品策略(编辑修改稿)
相关推荐
operation instructions shall be formulated under the anization of the Equipment Section of Manufacturing Department. The operator shall observe the operation instructions and keep the equipment in
行检验的产品,质量部通知制造部进行小批量试装或加工,并作好标识和记录。 原材料可依据随货质量证明文件进行判断。 For the products beyond AICQ inspection capabilities, the Quality Department shall inform the Manufacturing Department to conduct small batch
case the methods other than the standards are adopted. 所有试验规程、操作规程以及所需技术规范等均须在测试现场易于得到,供试验人员使用。 程 序 文 件 Procedure Document 重庆英特空调有限公司 Air International Chongqing Co., Ltd. 文件名称 (Doc Name): 实验室质量手 册
al and signature of department managers. 因生产需要应急采购原材料、协配件时,由采购物流部提出应急采购申请,经主管领导审批后进行采购。 If the raw materials and ponents need to be temporarily purchased due to production requirements, the Purchase
所有要求进行评审。 The contract or bidding documents shall be reviewed prior to acceptance or amendment, or tendering. 一般合同 General Contract 一般合同由销售人员直接在合同上进行评审, 应审查的项目有: General contract can be reviewed
支承框架标高 177。 10 3 管箱垂直度 5 4 管 箱中心线与构架立柱中心线间的间距 177。 5 5 相邻管箱的中间管板标高 177。 5 6 整个空气预热器的顶部标高 177。 5 7 管箱上部对角线差 15 8 波形伸缩节冷拉值 按图纸规定值 中国最大的管理资源中心 HPCC 4 检查项目评定标准 单位: mm 序 号 验 评 项 目 检验指标及要求 性质 部 件 规 格 质量标准