空调公司0602采购控制程序-采购管理(编辑修改稿)内容摘要:
al and signature of department managers. 因生产需要应急采购原材料、协配件时,由采购物流部提出应急采购申请,经主管领导审批后进行采购。 If the raw materials and ponents need to be temporarily purchased due to production requirements, the Purchase amp。 Logistics Department shall submit a temporary purchase 程 序 文 件 Procedure Document 重庆英特空调有限公司 Air International Chongqing Co., Ltd. 文件名称 (Doc Name): 采购控制程序 Purchase Control Procedures 版次 Ver 页次 Page 发行日期 Release Date 文件编号 (Doc No): AICQ/QP0602 B/0 3 5 20xx0110 application to the supervisory manager for approval. 采购产品的验证 Verification of Purchased Products 原材料、协配件到公司后,由采购物流部采购员和仓库管理员验证产品数量、名称、厂名、合格证或材质报告单,然后填写〈 外购件、外协件检验申请单 〉 ,报质 量部检验,执行《检验和试验控制程序》。 At the arrival of raw materials and ponents, the purchase representative and warehouse administrator of the Purchase amp。 Logistics Department shall verify the product quantity, product description, manufacturer’s name and quality certificate or material quality report, and then fill in Outsourced Parts Inspection Application Form and submits it to the Quality Department for inspection. Implement the “Inspection amp。 Test Control Procedures”. 顾客到分承包方处验货,由采购物流部安排采购员协助实施,但不能免除我方的验证、检验 或试验的责任。 If the customer plans to inspect the products at the place of subcontractors, the Purchase amp。 Logistics Department shall arrange purchase representative to provide assistance, but this will not release AICQ from the respon。空调公司0602采购控制程序-采购管理(编辑修改稿)
相关推荐
customer from the responsibilities for providing acceptable products. 对顾客提供的用于产品的原材料或零部件,抵达公司后由市场销售部办理接收手续、交采购物流部,由采购物流部填写送检单,并附上顾客提供产品的质量文件交质量部。 同时核对产品标识、数量和记录及相关文件归档备查。 At the arrival of customer
operation instructions shall be formulated under the anization of the Equipment Section of Manufacturing Department. The operator shall observe the operation instructions and keep the equipment in
行检验的产品,质量部通知制造部进行小批量试装或加工,并作好标识和记录。 原材料可依据随货质量证明文件进行判断。 For the products beyond AICQ inspection capabilities, the Quality Department shall inform the Manufacturing Department to conduct small batch
所有要求进行评审。 The contract or bidding documents shall be reviewed prior to acceptance or amendment, or tendering. 一般合同 General Contract 一般合同由销售人员直接在合同上进行评审, 应审查的项目有: General contract can be reviewed
支承框架标高 177。 10 3 管箱垂直度 5 4 管 箱中心线与构架立柱中心线间的间距 177。 5 5 相邻管箱的中间管板标高 177。 5 6 整个空气预热器的顶部标高 177。 5 7 管箱上部对角线差 15 8 波形伸缩节冷拉值 按图纸规定值 中国最大的管理资源中心 HPCC 4 检查项目评定标准 单位: mm 序 号 验 评 项 目 检验指标及要求 性质 部 件 规 格 质量标准
4. 爱心聚餐,其乐融融。 大家与老人们一同动手,包饺子,做小菜,彼此在生活的点滴中慢慢熟悉,渐渐培养情感,逐渐拉近你我的距离,让心靠得更近,让情谊融合得更紧。 5. 文娱小演,欢乐开怀。 由艺术团及院系为老人带来我们精心准备的文娱节目,唱红歌,民族舞,让老人回到当年那段峥嵘的岁月,尽情徜徉在往昔快乐的时光中。 戏剧,一段段空旷的声音,一幕幕令人熟悉的情景,或许对于我们而言并不 能勾起太多