电子类英语词汇(编辑修改稿)内容摘要:

on software,应用软件 approval,批准 approximate absolute temperature scale,近似绝对温标 aqueous vapour,水汽 arc suppressing varstor,消弧电压敏电阻器 arctic buoy,极地浮标 area effect,面积影响 area location,区域定位 area of cross section of the main air flow,主送风方向横截面积 argonion gun,氩离子枪 annular chamber,环室 argon ionization detector,氩离子化 检测器 arithmetic logic unit(ALU),算术逻辑运算单元 arithmetic mean,算术平均值 arithmetic weighted mean,算术加权平均值 arithmetical mean deviation of the(foughness)profile,(粗糙度)轮廓的算术平均偏差 arm error,不等臂误差 armature,动铁芯 array,阵,阵列 array configuration,阵排列 arrester varistor,防雷用电压敏电阻 器 articulated robot,关节型机器人 artificial defect,人工缺陷 artificial environment,人工环境 artificial field method instrument,人工电场法仪器 artificial intelligence,人工智能 artificial seawater,人工海水 ash fusion point determination meter,异步通信接口适配器 asynchronous input,异步输入 asynchronous transmission,异步传输 atmidometer,蒸发仪,蒸发表 atmometer,蒸发仪;蒸发表 atmoradiograph,天电强度计 atmosphere,气氛 atmospheric counter radiation,天气向下辐射 atmospheric electricity,大气电 atmospheric opacity,大气不透明度 atmospheric pressure,气压 atmospheric pressure altimeter,气压高度计 atmospheric pressure ionization(API),大气压电离 atmospherics,天电;远程雷电 atom force microscope,原子力显微镜 中国最庞大的下载资料库 (整理 . 版权归原作者所有 ) 第 10 页 共 182 页 atomic absorption spectrometry,原子吸收光谱法 atomic fluorescence spectrophotometer,原子荧光光度计 atomic fluorescence spectrometry,原子荧光光谱法 atomic mass unit,原子质量单位 atomic number correction,原子序数修正 atomin spectrum,原子光谱 atomicabsorption spectrophotometer,原子吸收分光光度计 atomization,原子化 atomizer,原子化器 attenuation,衰减 attenuation coefficient,衰减系数 attenuation length,衰减长度 attenuator,衰减器 attitude,姿态 attitude transducer[sensor],姿态传感器 audio monitor,监听器 audiofrequency spectrometer,声频频谱仪 audit,审核 Auger electron energy spectrometer(AEES),俄歇电子能谱仪 Auger electron image,俄歇电子象 Auger electron spectrometer,俄歇电子能谱仪 Auger electron spectroscopy(AES),俄歇电子能谱法 aurora,极光 autopensation logging instrument,电子自动测井仪 autopound current transformer,自耦式混合绕组电流互感器 autopolarization pensator,自动极化补偿器 autocorrelation function,自相关函数 automatic ., curve tracer,交、直流磁特性自动记录装置 automatic balancing machine,自动平衡机 automatic control,自动控制 automatic control souce of vacuum,真空自动控制电源 automatic control system,自动控制系统 automatic data processing,自动数据处理 automatic exposure device,自动曝光装置 automatic feeder for brine,盐水溶液自动补给器 automatic focus and stigmator,自动调焦和消象散装置 automatic level,自动安平水准仪 automatic levelling pensator,视轴安平补偿器 automatic/manual station。 A/M station,自动 /手动操作器 automatic programming,自动程度设计 automatic radio wind wane and anemometer,无线电自动风向风速仪 automatic railway weigh bridge,电子轨道衡 automatic scanning,自动扫查 automatic spring pipette,自动弹簧式吸液管 中国最庞大的下载资料库 (整理 . 版权归原作者所有 ) 第 11 页 共 182 页 automatic testing machine,自动试验机 automatic titrator,自动滴定仪 automatic tracking,自动跟踪 automatic vertical index,竖直度盘指标补偿器 automatic weather station,自动气象站 automation,自动化 automaton,自动机 auxiliary attachment,辅件 auxiliary controller bus(ACB),辅助控制器总线 auxiliary crate controller,辅助机箱控制器 auxiliary devices,辅助装置 auxiliary equipment(of potentiometer),(电位差计的)辅助设备 auxiliary gas,辅助气体 auxiliary output signal,辅助输出信号 auxiliary storage,辅助存储器 auxiliary terminal,辅助端 auxiliary type gravimeter,助动型重力仪 availability,可用性 available time,可用时间 average,平均值 average availability,平均可用度 average nominal characteristic,平均名义特性 average sound level,平均声级 average value of contarmination,污染的平均值 average wind speed,平均风速 axial clearance,轴向间隙 axial current flow method,轴向通电法 axial load,轴向载荷 axial sensitivity,轴向 灵敏度 axial vibration,轴向振动 axis of rotation,摆轴;旋转轴 axix of strain gauge,应变计 [片 ]轴线 B Bscope,B型显示 back flushing,反吹 background,后台,背景,本底 background current,基流 background mass spectrum,本底质谱 background noise,背景噪声 background processing,后台处理 background program,后台程度 Backman thermometer,贝克曼温度计 backscattered electron image,背散射电子象 中国最庞大的下载资料库 (整理 . 版权归原作者所有 ) 第 12 页 共 182 页 backward channel,反向信道 baffle wall,隔板 balance,天平 balance for measuring amount of precipitation,水量秤 balance output,对称输出 balance quality of rotor,转子平衡精度 balance wieght,平衡块 balanced plug,平衡型阀芯 balancing,平衡 balancing machine sensitivity,平衡机灵敏度 balancing machine,平衡机 balancing speed,平衡转速 ball pneumatic dead wieght tester,浮球压力计 ball screw assembly,滚珠丝杠副 ball valve,球阀 ballistic galvanometer,冲击栓流计 band,频带 bandwidth,带宽 band width of video amplifier,视频放大器频宽 bar primary bushing type current transformer,棒形电流互感器 barograph,气压计 barometer cistern,气压表水银槽 barometer,气压表 barometric correction,气压表器差修正 barometrograph,空盒气压计 barothermograph,气压温度计 barrel distortion,桶形畸变;负畸变 base,基底 base line,基线 base peak,基峰 base unit(of measurement),基本(测量)单位 baseband LAM,基带局域网 baseline drift,基线漂移 baseline noise,基线噪声 baseline potential,空白电位 baseline value,空白值 basic NMR frequency,基本核磁共振频率 basic standard,基础标准 batch control,批量控制 batch control station,批量控制站 batch inlet,分批进样 batch of strain gauge,应变计 [片 ]批 batch processing,成批处理 batch processing simulation,批处理仿真 中国最庞大的下载资料库 (整理 . 版权归原作者所有 ) 第 13 页 共 182 页 Baud,波特 beam,横梁;声速 beam deflector,电子束偏转器 beam path distance,声程 beam ratio,声束比 beam spot diameter,束斑直径 beamdeflection ultrasonic flowmeter,声速偏转式超声流量计 beamloading thermobalance,水平式热天平 bearing,轴承;刀承 bearing axis,轴承中心线 bdaring support,支承架 beat frequency oscillator,拍频振荡器 beat method(of measurement),差拍(测量)法 Beaufort scale,蒲福风级 Beckman differential thermometer,贝克曼温度计 bed,机座 Beer39。 law,比尔定律 bell manometer,钟罩压力计 bell prover,钟罩校准器 bellows,波纹管 bellow。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。