某家用电器公司20xx统计控制程序(编辑修改稿)内容摘要:

能力和过度调整等。 Human Resource Department should, based on the abovementioned statistical methonds, intentionally anize all people of relevant technology to take training as to let them know the basic concepts of statistical techniques, . variance differentiation, control (stability) capability, excessive adjustment, etc. 统计技术运用 Application of Statistical Techniques 质量部根据实际需要,组织相关部门确定应采用的统计技术,制订 统计项目要求一览表 , 经认可后, 由使用部门实施。 According need, Quality Department coordinates relevant departments to identify statistical techniques applied and formulate “List of Statistical Item Requirements”, which shall be implemented by department after being approved of. 各责任部门按统计项目定期收集数据,进行统计分析,并将统计结果传递给质量部。 Department shall periodically collect data per statistical items, and make statistical analysis, with results copied to Quality Department. 对各类统计分析发现的异常问题,由质量部组织各责任部门按《纠正和预防措施控制程序》办理。 If abnormal p。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。