某家用电器公司1001检验和试验控制程序(编辑修改稿)内容摘要:

partment to conduct small batch trial assembly or machining, and make labels and records properly. The raw materials can be judged per the quality certificates attached. 对因生产急需来不及检验的且可以追回的协配件 , 由制造部向总经理办公室申请紧急转序,填写《紧急例外放行申请单》,经总经理办公室审批同意方可放行,同时作好标识和记录并进行跟踪,经检验员后续及时抽检,发现不合格,立即追回。 For the ponents that are not inspected due to the urgency of production yet can be called back, they can be released only after the Manufacturing Department fills in urgent application for process transfer and submits it to the GM Office for approval. Meanwhile, make labels and records properly, and conduct tracking. The inspector shall duly conduct followup sampling inspection, and any unacceptable products shall be immediately called back. 抽检合格,由检验员开出 《产品合格通知单〉 入相应仓库。 If the sample inspection is acceptable, the inspector shall issue the Acceptance Parts Certificate, and admit the goods to the corresponding warehouse. 过程检验和试验 Process Inspection and Test 首件检验 initial inspection 每班 开班前或转换产品类型 /工装时,必须进行首件检验。 操作者自检必须合格后,交检验员检验并作好检验记录。 首件检验合格后,才可进行批量生产。 It is required to take initial inspection before the first shift starts or the type of production / tooling changes. After the selfinspection by operators is acceptable, inspectors should take inspection and record. The massproduction should be started if the initial inspection is acceptable. 在生产过程中,操作者应按照 SOP要求作好自检。 并对上道工序作好互检。 The inspector must conduct the selfinspection strict accordance with the requirements of SOP, and take mutualinspection for the last working procedure.. 检验员须按规定要求作好巡检工作。 The inspector should inspect during around the worksh。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。