某家用电器公司0401设计控制程序(编辑修改稿)内容摘要:
iewing and updating design failure mode and result analysis. 横向协调小组应使用《设计 FMEA检查表》评审公司制订的 DFMEA,顾客提 供的 DFMEA或设计协 作者提供的 DFMEA。 Coordination team should, according to DFMEA Checklist, review the DFMEA s made by the pany, provided the customers and the deign cooperators. 依据《产品设计开发计划》和设计任务书的要求,贯彻简化、优化、创新和减少浪费的原则, 并使用试验、生产现场的反馈信息,组织和实施产品设计,形成设计输出文件。 Engineering department is to anize and carry our product design and work out output documents according the Product D amp。 D Plan and requirements of design task statement, implementing the principle of simplification, optimizing, creativeness and decreasing waste and using the feedback from test and production site. 若设计外包,则工程技术部必须将相关的设计输入资料和《设计任务书》转交给设计外包方。 并要求设计外包方进 行 DFMEA,设计外包方设计完毕后,将相关资料转交工程技术部。 由设计组长组织人员进行按 进行设计评审。 If outside anization is entrusted to design, engineering department must transfer the relating design input data and design task statement to the entrusted contractor, and ask them to work out DFMEA. After the contractor pletes the job, they should pass the relevant data to engineering department. The design team leader is responsible for anizing people to conduct design review according to . 设计输出 Design Output 设计输出包括以下资料: Design Output includes the following data: 产品图; product drawing 根据相关行业标准和设计要求制订产品标准; to work out product standard according to relevant trade standard and design requirements。 材料标准; material standard 材料清单 BOM 设计评审 Design Audit 设计试验和验证 计划( DVP); Design teat and validation plan。 设计评审应在设计输出文件发放前进行,在重大设计更改时也须进行设计评审。 Design audit should be conducted before the design output documents are released. When there are great design changes, design audit must be made as well. 设计评审的内容: Contents of design audit: a) 设计输出是否满足设计输入的要求; whether design output meets the requirements of design input。 b) 满足顾客要求的程度及与产品标准的符合性; the degree how it satisfies customers’ requirements and how it plies with product standard。 c) 设计的合理性、工艺性、安全性和可靠性; rationality, technics, safety and reliability of design。 d) 设计的经济性,包括价格、成本(材料、工时和管理费等项目); economic effectiveness of design, including price, cost (material, labour time and overheads etc.)。 e) 新技术、新工艺、新材料、新结构采用的必要性和可能性; necessity and probability of using new technology, new process, new material and new structure。 f) 产品技术水平与同类产品性能的对比; benchmark in terms of product technology and function。 h) 是否符合有关法令、法规、相关标准与惯例; whether it accords with relevant laws, rules, regulations, standard and mon practice。 i) 产品标准化程度。 the degree of how prodcuts are standarized。 设计评审的组织 Design audit anizing 设计评审由工程技术部经理组织,参加设计评审的成员应由不直接承担设计责任人和参与设计的相关 部门的有丰富实践经验的人员组成,责任人可列席。 Engineering manager is responsible for anizing design audit with involvement of responsible people, who are not directly responsible for design, and experienced people from relevant departments. All responsible persons can participate in it. 设计评审报告书 Design Audit Report 设计小组组长根据产品设计的评审情况,整理产品的《 设计评审报告 》。 设计小组依据评审结论,修订完善产品设计输出文件并发放设计输出文件,转入样件试制阶段。 Design team leader shall, based on the result of design audit, work out Product Design Audit Report. Design team, according to audit result, revise and improve product design output documents and release them, then it es to stage of prototype trial making. 样件制造和设计验证阶段 prototype trial maki。某家用电器公司0401设计控制程序(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。