练习mapstatementtopa(编辑修改稿)内容摘要:

criteria and guidelines that allows each project to adapt and customize the standard processes to meet its specific needs. As the project goes along, we make sure that the expected interactions with identified affected parties (., technical review meetings) are occurring as needed. We have our own quality assurance people regularly check on the quality assurance activities performed by our key suppliers and suggest corrective actions as needed. Deviations from documented plans and procedures that cannot be resolved at the project level are always reported to the group manager, who sees to it that the deviations are either corrected or documented as a justified exception. Whenever a major process or technology change is considered for adoption, we first conduct a pilot trial of the change and pare the measured performance impacts to our expectations.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。